My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/04/2014
CBCC
>
Meetings
>
2010's
>
2014
>
02/04/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:10:22 PM
Creation date
9/25/2015 5:40:56 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/04/2014
Meeting Body
Board of County Commissioners
Book and Page
202
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Page 5 of 6, Resume of F. San Miguel, 3/7/10 <br />During that same period of time, I initiated and carried through to completion the marketing <br />effort leading to the company's first project offshore Kazakhstan. In 1999 OKIOC, the <br />consortium of international operating companies developing the Kashagan field awarded our <br />company its first offshore construction project, the installation of a system of piles at its first two <br />drilling locations in that field. This project was carried out as a joint venture project between <br />various operating entities of SOCAR, the State Oil Company of Azerbaijan Republic, and <br />McDermott Middle East. <br />Concurrently, Ialso led a study to establish the feasibility of establishing ax gas import _part <br />facil in the Sonrniami Ba` of southern Pakistan an: area completely undeveloped, for a major <br />ty Y <br />oil company operating in that�country Upon my reco'inmendation, we decided to exit that project <br />,. :. <br />at'an early stage Tleuncertainty of supply and demand, the level of mvestm'ent m _resources <br />requu'edand the political climate made this project unattractiive. <br />Upon retirement m 1999mIthaver consulted part time,tmostly m the former Sov-ret Union, Spain <br />aAnd Mexico assistingshipyardt and offshore construction corn .. fl .. ...the marketing <br />estunating proposal ereparation: and negohat ng;for�the constructiont na.rme,e- 1110nt I have <br />... deter..... e profitability; of ship repait-iand.offshore _platform <br />rated Statesland Mexico: <br />also•prepared feast <br />construction ache. <br />In Russia, I participated for about two years in a project to help Vyborg Shipyard, Vyborg, <br />Russia enter the international shipbuilding market. While working with their marketing <br />department I advised them in the restructuring of their ship construction estimating system In <br />Spain, I. advised Dragados, a major Spanish fabncator of offshore structures on the preparation <br />of a proposal for the construction of offshore jack up rigs. In 2007 and 2008, in Mexico, I <br />assisted Talleres Navales del Golfo, (TNG) Veracruz, Mexico in their efforts to re enter the ship <br />building field after ten years of specializing solely in offshore fabrication under their former <br />owners, J. Ray McDermott & Co., TNG. Is a wholly owned subsidiary of Hutchinson Port <br />Holdings, one of the largest ports operating companies in the world. More recently I performed a <br />feasibility study to determine the profitability of building a floating dry dock in Alvarado, <br />Mexico, for the repairs of ships engaged in supporting the offshore oil fields in the Mexican <br />sector of the Gulf of Mexico. <br />3/7/10 5 <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.