My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/22/2011
CBCC
>
Meetings
>
2010's
>
2011
>
03/22/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2016 11:06:52 AM
Creation date
9/25/2015 5:03:57 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
03/22/2011
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
4048
Book and Page
140, 633-677
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> evidence presented demonstrates that the A- 1 Walee site would be in compliance with the Land <br /> Development Regulations in the Comprehensive Plan , <br /> Planning Director Stan Boling explained that the Applicant proposes to have a Concrete <br /> and Mulching Recycling Center requiring an Administrative Use permit, and a Construction & <br /> Demolition (C &D) Debris Processing facility, requiring a Special Exception Use permit which <br /> must be approved by the Board. Continuing the PowerPoint Presentation, he displayed the <br /> proposed site and surrounding areas and gave an overview of the Applicant ' s proposed <br /> operations . He reviewed the special exception use criteria for demolition debris sites , confirmed <br /> staff' s recommendation for Board approval of the request, and relayed that at its February 24 , <br /> 2011 meeting, the Planning & Zoning Commission (P & Z) had unanimously recommended <br /> Board approval of the special exception use request, with the conditions recommended by staff. <br /> Staff addressed the Commissioners ' queries and remarks on the stockpile size limitations ; <br /> fire safety ; whether a processing site is a permitted special exception use in Agricultural (AG) <br /> Zoning ; why FDEP is requiring the separate stormwater basin and whether there will be <br /> monitoring wells ; whether there are any other local construction and demolition recyclers ; and <br /> whether the entire processing area will be outdoors . <br /> Commissioner Flescher presented maps not produced by County Staff (Exhibits 2 , 3 , 4A, <br /> and 4B) , to illustrate that there were several different maps of the same area with different <br /> information . <br /> Barry G . Segal, Barry Segal , P . A . , 621 17th Street ; representing applicant Luisa Garcia <br /> and A- 1 Walee Recycling Center, LLC ("the Applicant") , introduced himself. He sought and <br /> received confirmation that Exhibits 2 through 413 had not been part of the original Agenda <br /> Packet provided to the Board: <br /> Keith M. Poliakoff, P.A. , Becker & Poliakoff, Pt . St. Lucie , representing Party <br /> Intervenor South County Preservation Society, LLC ("the Intervenor") introduced himself. He <br /> March 22 , 2011 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.