My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-002
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 10:35:44 AM
Creation date
9/30/2015 3:32:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/05/2010
Control Number
2010-002
Agenda Item Number
8.M.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Road Widening
Area
20th Avenue SW fropm 25th Street SW to 21st St. SW
Bid Number
2010014
Supplemental fields
SmeadsoftID
8076
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
subsurface or physical conditions or performing any c. CONTRACTOR failed to give the <br /> Work in connection therewith (except in an emergency written notice within the time and as ye- <br /> as required by paragraph 6 . 16 .A) , notify OWNER and quired by paragraph 4 .03 .A. <br /> ENGINEER in writing about such condition . <br /> CONTRACTOR shall not further disturb such 3 . If OWNER and CONTRACTOR are <br /> condition or perform any Work in connection therewith unable to agree on entitlement to or on the <br /> (except as aforesaid ) until receipt of written order to do amount or extent, if any, of any adjustment in <br /> SO. the Contract Price or Contract Times, or both , a <br /> Claim may be made therefor as provided in <br /> B . ENGINEER 's Review. After receipt of written paragraph 10 . 05 . However, OWNER, <br /> notice as required by paragraph 4 . 03 .A, ENGINEER ENGINEER, and ENGINEER's Consultants <br /> will promptly review the pertinent condition , determine shall not be liable to CONTRACTOR for any <br /> the necessity of OWNER's obtaining additional claims , costs , losses , or damages (including <br /> exploration or tests with respect thereto, and advise but not limited to all fees and charges <br /> of <br /> OWNER in writing (with a copy to CONTRACTOR) of engineers , architects , attorneys, and other <br /> ENGINEER's findings and conclusions . professionals and all court or arbitration or other <br /> dispute resolution costs) sustained by <br /> C . Possible Price and Times Adjustments CONTRACTOR on or in connection with any <br /> 1 . The Contract Price or the Contract other project or anticipated project. <br /> Times, or both , will be equitably adjusted to the 4 . 04 Underground Facilities <br /> extent that the existence of such differing <br /> subsurface or physical condition causes an in- A. Shown or Indicated. The information and data <br /> crease or decrease in CONTRACTOR's cost shown or indicated in the Contract Documents with <br /> of, or time required for, performance of the respect to existing Underground Facilities at or <br /> Work; subject, however, to the following : contiguous to the Site is based on information and <br /> data furnished to OWNER or ENGINEER by the <br /> a . such condition must meet any one or owners of such Underground Facilities, including <br /> more of the categories described in para- OWNER, or by others . Unless it is otherwise <br /> graph 4 . 03 .A; and expressly provided in the Supplementary Conditions : <br /> b , with respect to Work that is paid for 1 . OWNER and ENGINEER shall not <br /> on a Unit Price Basis, any adjustment in be responsible for the accuracy or com- <br /> Contract Price will be subject to the pleteness of any such information or data; and <br /> provisions of paragraphs 9 . 08 and 11 .03 . <br /> 2 . the cost of all of the following will be <br /> 2 . CONTRACTOR shall not be entitled included in the Contract Price, and CONTRAC- <br /> to any adjustment in the Contract Price or TOR shall have full responsibility for: <br /> Contract Times if: <br /> a . reviewing and checking all such <br /> a . CONTRACTOR knew of the information and data , <br /> existence of such conditions at the time <br /> CONTRACTOR made a final commitment b . locating all Underground Facilities <br /> to OWNER in respect of Contract Price and shown or indicated in the Contract <br /> Contract Times by the submission of a Bid Documents , <br /> or becoming bound under a negotiated <br /> contract; or c. coordination of the Work with the <br /> owners of such Underground Facilities , <br /> b . the existence of such condition could including OWNER, during construction , and <br /> reasonably have been discovered or <br /> revealed as a result of any examination , d . the safety and protection of all such <br /> investigation , exploration , test, or study of Underground Facilities and repairing any <br /> the Site and contiguous areas required by damage thereto resulting from the Work. <br /> the Bidding Requirements or Contract <br /> Documents to be conducted by or for CON- B . Not Shown or Indicated <br /> TRACTOR prior to CONTRACTOR's <br /> making such final commitment; or 1 . If an Underground Facility is <br /> uncovered or revealed at or contiguous to the <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 12 <br /> F:\Engineering\Capital Projects\0541 20th Ave Widening, 25th St SW to 21st St SW\Contract Documents\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.