My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-002
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 10:35:44 AM
Creation date
9/30/2015 3:32:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/05/2010
Control Number
2010-002
Agenda Item Number
8.M.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Road Widening
Area
20th Avenue SW fropm 25th Street SW to 21st St. SW
Bid Number
2010014
Supplemental fields
SmeadsoftID
8076
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 . 02 Change of Contract Times surety for or employee or agent of any of them , for <br /> damages arising out of or resulting from : <br /> A. The Contract Times (or Milestones ) may only <br /> be changed by a Change Order or by a Written 1 . delays caused by or within the control <br /> Amendment. Any Claim for an adjustment in the of CONTRACTOR; or <br /> Contract Times (or Milestones) shall be based on <br /> written notice submitted by the party making the claim 2 . delays beyond the control of both <br /> to the ENGINEER and the other party to the Contract OWNER and CONTRACTOR including but not <br /> in accordance with the provisions of paragraph 10 . 05 . limited to fires , floods , epidemics , abnormal <br /> weather conditions , acts of God , or acts or <br /> B . Any adjustment of the Contract Times (or neglect by utility owners or other contractors <br /> Milestones) covered by a Change Order or of any performing other work as contemplated by <br /> Claim for an adjustment in the Contract Times (or Article 7 . <br /> Milestones) will be determined in accordance with the <br /> provisions of this Article 12 . B . Nothing in this paragraph 12 .06 bars a <br /> change in Contract Price pursuant to this Article 12 to <br /> 12 . 03 Delays Beyond CONTRACTOR's Control compensate CONTRACTOR due to delay, <br /> interference, or disruption directly attributable to <br /> A. Where CONTRACTOR is prevented from actions or inactions of OWNER or anyone for whom <br /> completing any part of the Work within the Contract OWNER is responsible . <br /> Times (or Milestones) due to delay beyond the control <br /> of CONTRACTOR, the Contract Times (or <br /> Milestones) will be extended in an amount equal to the ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> time lost due to such delay if a Claim is made therefor CORRECTION , REMOVAL OR ACCEPTANCE OF <br /> as provided in paragraph 12 .02 .A. Delays beyond the DEFECTIVE WORK <br /> control of CONTRACTOR shall include, but not be <br /> limited to, acts or neglect by OWNER, acts or neglect <br /> of utility owners or other contractors performing other 13 . 01 Notice of Defects <br /> work as contemplated by Article 7 , fires , floods , <br /> epidemics , abnormal weather conditions , or acts of A. Prompt notice of all defective Work of which <br /> God . OWNER or ENGINEER has actual knowledge will be <br /> given to CONTRACTOR. All defective Work may be <br /> 12 .04 Delays Within CONTRACTOR's Control rejected , corrected , or accepted as provided in this <br /> Article 13 . <br /> A. The Contract Times (or Milestones) will not be <br /> extended due to delays within the control of 13 .02 Access to Work <br /> CONTRACTOR. Delays attributable to and within the <br /> control of a Subcontractor or Supplier shall be A. OWNER, ENGINEER, ENGINEER's Con- <br /> deemed to be delays within the control of CONTRAC- sultants , other representatives and personnel of <br /> TOR. OWNER, independent testing laboratories , and <br /> governmental agencies with jurisdictional interests will <br /> 12 . 05 Delays Beyond OWNER's and have access to the Site and the Work at reasonable <br /> CONTRACTOR 's Control times for their observation , inspecting, and testing . <br /> CONTRACTOR shall provide them proper and safe <br /> A. Where CONTRACTOR is prevented from conditions for such access and advise them of <br /> completing any part of the Work within the Contract CONTRACTOR's Site safety procedures and <br /> Times (or Milestones) due to delay beyond the control programs so that they may comply therewith as <br /> of both OWNER and CONTRACTOR, an extension of applicable. <br /> the Contract Times (or Milestones ) in an amount <br /> equal to the time lost due to such delay shall be 13 . 03 Tests and Inspections <br /> CONTRACTOR's sole and exclusive remedy for such <br /> delay. A. CONTRACTOR shall give ENGINEER timely <br /> notice of readiness of the Work for all required <br /> 12 . 06 Delay Damages inspections , tests , or approvals and shall cooperate <br /> with inspection and testing personnel to facilitate <br /> A. In no event shall OWNER or ENGINEER be required inspections or tests . <br /> liable to CONTRACTOR, any Subcontractor, any <br /> Supplier, or any other person or organization , or to any <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 35 <br /> FAEngineering\Capital Projects\0541 20th Ave Widening, 25th St SW to 21st St SWtContract Documents\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.