Laserfiche WebLink
subcontract until all similar insurance required of the Subcontractor has been so <br /> obtained and approved . All such insurance shall remain in effect until final <br /> payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13 . <br /> SC -2 . 06 Preconstruction Conference <br /> SC-2 . 06 Delete paragraph GC-2. 06. A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work, the Construction Coordination Manager will call a preconstruction <br /> conference at a place the ENGINEER designates to establish an understanding <br /> among the parties as to the work and to discuss schedules referred to in <br /> paragraph 2 . 05 . 6 , procedures for handling Shop Drawings and other submittals , <br /> and maintaining required records . Utility companies and others as appropriate <br /> will be requested to attend to discuss and coordinate work . <br /> SC -3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> SC-3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 , Addenda <br /> 3 , Specifications <br /> 4 , Supplementary Conditions to the General Conditions <br /> 5 , General Conditions <br /> 6 , Approved Shop Drawings <br /> 7 , Drawings <br /> 8 , Referenced Standards . <br /> B . Written/computed dimensions shall govern over scaled dimensions . <br /> SC -4. 02 Subsurface and Physical Conditions <br /> SC-4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. 8: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER's <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> Roadway Soil Survey — Road Widening of 20th Avenue SW , from 25th Street SW <br /> to 21 st Street SW . <br /> D . Reports and drawings itemized in SC4 . 02 . 0 are not included with the Bidding <br /> Documents . Copies may be examined at Indian River County Administration <br /> Building Public Works 1801 27th Street, Vero Beach , FL 32960 during <br /> regular business hours . These reports and drawings are not part of the Contract <br /> Documents . <br /> SC -5 . 01 Performance , Payment and Other Bonds <br /> SC-5 . 01 . A. Delete paragraph GC-5. 01 .A in its entirety and insert the following paragraphs in its <br /> place: <br /> 00800-2 <br /> 00800 - Supplementary Conditions 06-09 rev . doc <br /> FAEngineering\Capital Projects\0541 20th Ave Widening, 25th St SW to 21st St SW\Contract Documents\00600 - Supplementary Conditions 06-09 rev.doc <br />