My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-002
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 10:35:44 AM
Creation date
9/30/2015 3:32:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/05/2010
Control Number
2010-002
Agenda Item Number
8.M.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Road Widening
Area
20th Avenue SW fropm 25th Street SW to 21st St. SW
Bid Number
2010014
Supplemental fields
SmeadsoftID
8076
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
subcontract until all similar insurance required of the Subcontractor has been so <br /> obtained and approved . All such insurance shall remain in effect until final <br /> payment and at all times thereafter when CONTRACTOR may be correcting , <br /> removing or replacing defective Work in accordance with Article 13 . <br /> SC -2 . 06 Preconstruction Conference <br /> SC-2 . 06 Delete paragraph GC-2. 06. A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work, the Construction Coordination Manager will call a preconstruction <br /> conference at a place the ENGINEER designates to establish an understanding <br /> among the parties as to the work and to discuss schedules referred to in <br /> paragraph 2 . 05 . 6 , procedures for handling Shop Drawings and other submittals , <br /> and maintaining required records . Utility companies and others as appropriate <br /> will be requested to attend to discuss and coordinate work . <br /> SC -3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> SC-3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 , Addenda <br /> 3 , Specifications <br /> 4 , Supplementary Conditions to the General Conditions <br /> 5 , General Conditions <br /> 6 , Approved Shop Drawings <br /> 7 , Drawings <br /> 8 , Referenced Standards . <br /> B . Written/computed dimensions shall govern over scaled dimensions . <br /> SC -4. 02 Subsurface and Physical Conditions <br /> SC-4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. 8: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER's <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> Roadway Soil Survey — Road Widening of 20th Avenue SW , from 25th Street SW <br /> to 21 st Street SW . <br /> D . Reports and drawings itemized in SC4 . 02 . 0 are not included with the Bidding <br /> Documents . Copies may be examined at Indian River County Administration <br /> Building Public Works 1801 27th Street, Vero Beach , FL 32960 during <br /> regular business hours . These reports and drawings are not part of the Contract <br /> Documents . <br /> SC -5 . 01 Performance , Payment and Other Bonds <br /> SC-5 . 01 . A. Delete paragraph GC-5. 01 .A in its entirety and insert the following paragraphs in its <br /> place: <br /> 00800-2 <br /> 00800 - Supplementary Conditions 06-09 rev . doc <br /> FAEngineering\Capital Projects\0541 20th Ave Widening, 25th St SW to 21st St SW\Contract Documents\00600 - Supplementary Conditions 06-09 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.