My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-334
CBCC
>
Official Documents
>
1990's
>
1995
>
1995-334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 12:52:35 PM
Creation date
10/1/2015 12:59:41 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/19/1995
Control Number
1995-334
Entity Name
Talcom, Inc.
Subject
North Communication Tower
Supplemental fields
SmeadsoftID
8013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNTY must provide 30 -day written notice to TENANT before it <br />may modify, alter or change the facilities identified in Exhibit <br />"C" and/or prior to placing, modifying, altering or ,changing any <br />additional facilities other than that which is described in Exhibit <br />"C" on or about the Tower; COUNTY'S notice must describe the <br />proposed modifications, alterations, changes and facilities. Prior <br />to making any modification, alteration, change or addition to the <br />facilities described in Exhibit "C", COUNTY must have performed and <br />delivered to TENANT a structural analysis of the Tower. The <br />structural analysis must consider TENANT'S future facilities <br />identified on Exhibit "D" and COUNTY's proposed modifications, <br />alternations, changes and additions. The purpose of the structural <br />analysis is to allow TENANT to determine whether such modification, <br />alteration, change or additional facility or facilities will affect <br />the structural integrity of the Tower or affect TENANT'S ability to <br />place additional faeilitiee on the Tower& if TENANT determines <br />that such additional facilities or such modifications, alterations <br />or changes would affect the structural integrity of the Tower or <br />affect TENANT'S future use of and placement of additional <br />facilities on the Tower, COUNTY shall take whatever action <br />necessary, in cooperation with TENANT, to eliminate such effects. <br />In no event may COUNTY's modification, alteration, change or <br />addition to the facilities identified in Exhibit "C" interfere with <br />or affect TENANT'S ability or desire to construct additional <br />facilities on the Tower to accommodate TENANT'S increased customer <br />demands and/or technological requirements. COUNTY shall be <br />responsible for all costs associated with preparing such an <br />analysis and the costs, if any, of making any changes, <br />modifications or alterations to the Tower necessary to accommodate <br />COUNTY'S proposed modification, alteration, change or addition to <br />its facilities. <br />Any and all facilities placed on or any modifications to such <br />facilities located on or about the Tower by COUNTY shall be <br />purchased, installed and maintained by such party, at its expense. <br />The installation, repair, alteration and/or maintenance of COUNTY's <br />equipment shall be performed only by contractors or subcontractors <br />who are qualified to perform such work in a manner consistent with <br />TENANT's construction and maintenance standards. COUNTY must <br />arrange for its contractor or subcontractor to include TENANT as an <br />additional insured under their Comprehensive General Liability <br />Policy in an aggregate amount of five million dollars. Prior to <br />commencing such construction related activity, COUNTY must provide <br />TENANT with a Certificate of Insurance evidencing such coverage and <br />including TENANT no an additional insured, <br />c. TENANT shall have the right to occupy certain floor space <br />within the Equipment Building and shall have the right to place <br />within such area, telecommunications equipment and attendant <br />facilities necessary to the operation and maintenance of TENANT's <br />business. COUNTY shall have the right to occupy up to 700 square <br />feet of floor space located in the Equipment Building for the <br />purpose of housing its telecommunication facilities. <br />3 <br />.2•../- - "T'f' rr''^""""YV i,.. .•_...t -s. Imo.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.