My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02403 <br /> ' INSTALLATION OF DRAINAGE PIPE AND STRUCTURES <br /> L SCOPE . <br /> A . This section covers the handling of materials and the work required to install , <br /> ' construct and join, piping, fittings , and appurtenances for a complete drainage <br /> system as shown on the Drawings and specified herein. <br /> ' 2 . GENERAL REQUIREMENTS <br /> A . All work shall be proved to be in first class condition and constructed properly in <br /> accordance with the Drawings and Specifications . All defects and leaks <br /> disclosed by required testing shall be remedied. All tests shall be performed by the <br /> Contractor and observed by the Engineer. <br /> B . All pipe and structures shall be installed on dry, firm bedding . The free-water <br /> surface shall be lowered to at least 12 inches below the bedding surface prior to <br /> placing pipe or structures and shall be maintained at that depth throughout bedding, <br /> haunching, and initial backfilling of the work. During subsequent backfilling, the <br /> water level shall be kept sufficiently below the working surface to allow <br /> compaction of backfill to the required density, and until required density tests <br /> have been performed. <br /> C . Temporary supports shall be installed for adequate protection and <br /> maintenance of all underground and surface structures, water lines, drains , and <br /> other obstructions encountered in the progress of the work. Any structures <br /> which may have been disturbed shall be restored upon completion of the work. <br /> D . Blasting shall not be permitted except by written approval of the Engineer. <br /> E . Trenching and subsequent backfilling within the general construction site shall be <br /> accomplished as expeditiously as possible in order to prevent trench decay and <br /> maintain a clear operational area. <br /> F . Prior to any excavation or trenching outside the designated limits of the work site , <br /> the Contractor shall secure the necessary permits and/or authorization from the <br /> applicable Owner, or confirm that such has been previously obtained. The <br /> stipulations of said permit or authorization shall be completely followed <br /> and, prior to construction operations , notice shall be provided to the appropriate <br /> Owner and Engineer. <br /> ' G. All work shall be installed in accordance with these specifications, the <br /> applicable sections of the FDOT specifications , manufacturers <br /> recommendations and the Drawings . <br /> ' C : \ Down1oad \ techspec - 02903 . doc <br /> 02903 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.