My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape shall be furnished in manufacturers' standard roll length, meeting the "American <br /> Public Works Association" (APWA) color code, and shall be imprinted continuously <br /> with the following words, unless otherwise approved : <br /> " CAUTION BURIED WATER MAIN BELOW" <br /> Detectable buried warning tape shall be equal to or better than "PRO-LINE" <br /> underground utility marking tape as manufactured by Pro -Line Safety Products Co . , <br /> 1099 Atlantic Drive, Unit # l , West Chicago , IL . <br /> F . Detectable Buried Trace Wire <br /> Trace wire shall be continuous # 14 THHN, single conductor copper wire . PVC color <br /> sheathing shall meet the color code of the "American Public Works Association" <br /> (APWA) . <br /> 3 . EXECUTION OF WORK <br /> The installation and testing of the water main shall be done in accordance with AWWA <br /> (ANSI) C600 for ductile iron pipe or AWWA M23 for P .V . C . pipe, plus the <br /> additional requirements described herein or shown on the Plans . <br /> A . Preparation <br /> 1 . Clearing - The Contractor shall perform all clearing necessary, where <br /> applicable, for the proper installation of all water mains , and <br /> appurtenances in the locations shown on the drawings . Plantings, <br /> shrubbery, trees, utility poles or structures subject to damage resulting from the <br /> excavation shall be transplanted, relocated, braced, shored or otherwise <br /> protected and preserved unless otherwise directed by the Engineer. <br /> B . Trenching <br /> 1 . Pavement Cutting - Asphaltic pavements shall be cut by pneumatic <br /> hammers or mechanical pavement cutters ; saws , or other method <br /> approved by the Engineer. Concrete pavement or concrete base <br /> pavement shall be sawed. Both types of pavement shall be cut and removed <br /> RELor to any excavation . <br /> 2 . Excavation - The excavation in which the pipes and appurtenances are to be <br /> constructed shall be excavated in open cut, except where otherwise <br /> stated on the Plans , in such a manner to such depths and widths as will <br /> give suitable room for bracing , supporting, pumping , draining and for <br /> removing from the excavation any material which the Engineer may decide is <br /> inadequate for foundation. The maximum trench width at the top of the <br /> pipe shall be in accordance with the trenching details . <br /> The Contractor may, where it will not interfere with the work or adjacent <br /> structures or property , slope the sides of excavation. The sides of the trench <br /> may only be sloped from a point in compliance with the trenching details . <br /> CADown1oad\techspec-02501 .doc SC501 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.