My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Be After floating, test surface to trueness with a 10' straightedge . Distribute concrete <br /> as required to remove surface irregularities , and refloat repaired areas to provide a <br /> continuous smooth finish. <br /> ' C . Work edges of slabs , back top edge of curb, and formed joints with an edging tool , <br /> and round to %Z " radius , unless otherwise indicated. Eliminate tool marks on <br /> concrete surface . <br /> D . After completion of floating and when excess moisture or surface sheen has <br /> ' disappeared, complete surface finishing as follows : <br /> 1 . Broom finish, by drawing a fine-hair broom across concrete surface, <br /> ' perpendicular to line of traffic . Repeat operation if required to provide a fine <br /> line texture acceptable to Architect. <br /> tE . Do not remove forms for 24 hours after concrete has been placed . After form <br /> removal, clean ends of joints and point-up any minor honey-combed areas . <br /> ' Remove and replace areas of sections with major defects , as directed by Architect. <br /> 3 . 05 CURING <br /> rA . Protect and cure finished concrete paving, complying with applicable requirements <br /> of Division 3 sections . Use moist-curing methods for initial curing whenever <br /> ' possible . <br /> 3 . 06 REPAIRS AND PROTECTION <br /> ' A . Repair or replace broken or defective concrete , as directed by Architect. <br /> ' Be Drill test cores where directed by Architect, when necessary to determine <br /> magnitude of cracks or defective areas . Fill drilled core holes in satisfactory <br /> pavement areas with portland cement concrete bonded to pavement with epoxy <br /> resin grout. <br /> C . Protect concrete from damage until acceptance of work. Exclude traffic from <br /> pavement for at least 14 days after placement. When construction traffic is <br /> permitted , maintain pavement as clean as possible by removing surface stains and <br /> ' spillage of materials as they occur. <br /> D . Sweep concrete pavement and wash free of stains , discolorations , dirt and other <br /> foreign material just prior to final inspection. <br /> * * * END OF SECTION * * * <br /> 02515-4 <br />