My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . Detectable Buried Trace Wire <br /> Trace wire shall be continuous # 14 THHN, single conductor copper wire . PVC color <br /> sheathing shall meet the color code of the "American Public Works Association" <br /> (APWA) . <br /> E . Foundation Rock <br /> A sieve analysis of the limerock shall conform to the following limits : <br /> Passing 1 " - 100% <br /> Passing 3 /4 " - 90 - 100% <br /> Passing 3 /8 " - 20 - 55 % <br /> Passing #4 - 0 - 10% <br /> Passing # 8 - 0 - 5 % <br /> 3 . INSTALLATION <br /> A . General Requirements <br /> 1 ) All work shall be proved to be in first class condition and constructed <br /> properly in accordance with the Drawings and Specifications . All <br /> defects and leaks disclosed by required testing shall be remedied. All tests <br /> shall be performed by the Contractor and observed by the Engineer. <br /> 2) All pipe and structures shall be installed on dry, firm bedding . The free <br /> water surface shall be shall be lowered to at least 12 inches below the <br /> bedding surface prior to placing pipe or structures and shall be <br /> maintained at that depth throughout bedding , haunching, and initial <br /> backfilling of the work. During subsequent backfilling , the water level shall <br /> be kept sufficiently below the working surface to allow <br /> compaction of backfill to the required density, and until required <br /> density tests have been performed . <br /> 3 ) Temporary supports shall be installed for adequate protection and <br /> maintenance of all underground and surface structures, water lines , <br /> drains, and other obstructions encountered in the progress of the work. Any <br /> structure which may have been disturbed shall be restored upon completion <br /> of the work. <br /> 4) Blasting shall not be permitted except by written approval of the <br /> Engineer. <br /> 5 ) Trenching and subsequent backfilling within the general construction site <br /> shall be accomplished as expeditiously as possible in order to prevent <br /> trench decay and maintain a clear operational area. <br /> C :\DoHmload\techspec-02601 .doc SC601 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.