Laserfiche WebLink
SECTION 02920 - CLAY INFIELD MATERIAL <br /> PART 1 - GENERAL <br /> 1 . 01 DESCRIPTION <br /> A. This work shall consist of loading, hauling and spreading of clay infield material in <br /> accordance with these specifications and the Contract Drawings . <br /> 1 . 02 JOB CONDITIONS <br /> A . If, during the placement of infield material, either the weather or the clay becomes <br /> unsuitable for spreading, operations shall cease and only be resumed when authorized <br /> by the Owner' s Representative. <br /> PART 2 - PRODUCTS <br /> 2 . 01 CLAY INFIELD MATERIAL <br /> A . Clay shall be bright orange in color and shall be free of refuse and debris . <br /> B . Clay infield material shall be no less than 50% Florida Orange Clay and no more <br /> than 50% clean Yellow Sand . <br /> Co The clay infield material shall be thoroughly mixed together prior to placement on <br /> the prepared field sub-base . <br /> PART 3 - EXECUTION <br /> 3 . 01 PREPARATION <br /> A . Before applying clay infield material, the areas to be treated shall be pressed and <br /> shaped to a uniform surface . <br /> 3 . 02 INSTALLATION <br /> A . Florida Clay infield material shall be spread on designated areas to a minimum depth <br /> of six (6) inches , over a four (4) inch yellow sand sub-base at 98 % compaction. <br /> Be Clay infield material shall be compacted with a roller weighing no less than 500 lbs , <br /> 02920- 1 <br />