My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A . All other materials , not specifically described but required for proper completion of <br /> concrete formwork, shall be as selected by the Contractor subject to the advance <br /> approval of the Engineer. <br /> PART 3 - EXECUTION <br /> 3 . 01 SURFACE CONDITIONS <br /> A . Inspection and Soil Treatment : <br /> 1 . Prior to all work of this section, carefully inspect the installed work of all <br /> other trades and verify that all such work is completed to the point where <br /> this installation may properly commence . <br /> 2. Verify that forms may be constructed in accordance with all pertinent codes <br /> and regulations , the referenced standards, and the original design. <br /> 3 . Treat underlying soil to prevent vegetation growth and insect infestation. <br /> 3 . 02 CONSTRUCTION OF FORMS <br /> A. General : <br /> 1 . Construct all required forms to be substantial, sufficiently tight to prevent <br /> leakage of mortar, and able to withstand pressures without excessive <br /> deflection when filled with wet concrete . <br /> B . Embedded Items : <br /> 1 . Set all required steel frames , angles , grilles, bolts, inserts , and other such <br /> items required to be anchored in the concrete before the concrete is placed . <br /> C . Bracing : <br /> 1 . Properly brace and tie the forms together so as to maintain position and <br /> shape and to ensure safety to personnel . <br /> 2 . Construct all bracing and supporting members of amply size and strength to <br /> safely carry, without excessive deflection, all dead and live loads to which <br /> they may be subjected . <br /> 3 . Space the forms the proper distance apart and securely tie them together, <br /> using metal spreader ties that vie positive tieing and accurate spreading <br /> 3 . 03 RE-USE OF FORMS <br /> 03100 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.