My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . Variation in Cross- Sectional Dimensions : <br /> For columns and thickness of walls , from dimensions shown, do not exceed minus <br /> 1 /4 " nor plus % " . <br /> E . Variation in Mortar Joint Thickness : <br /> Do not exceed bed joint thickness indicated by more than plus or minus 1 /8 " , with a <br /> maximum thickness limited to % " . Do not exceed head joint thickness indicated by <br /> more than plus or minus 1 /8 ". <br /> 3 . 03 LAYING MASONRY WALLS <br /> A. Layout walls in advance for accurate spacing of surface bond patterns with uniform <br /> joint widths and to accurately locate openings, movement-type joints , returns and <br /> offsets . Avoid the use of less-than-half-size units at corners, jambs and wherever <br /> possible at other locations . <br /> B . Lay-up walls to comply with specified construction tolerances, with courses <br /> accurately spaced and coordinated with other work. <br /> Co Stopping and Resuming Work : <br /> Rack back '/2-unit length in each course : do not tooth . Clean exposed surfaces of <br /> set masonry, wet units lightly (if required) and remove loose masonry units and <br /> mortar prior to laying fresh masonry . <br /> D . Built-in Work: <br /> As the work progresses , build-in items specified under this and other sections of <br /> these specifications . Fill in solidly with masonry around built-in items . <br /> 1 . Fill space between hollow metal frames and masonry solidly with mortar, <br /> unless otherwise indicated . Where built-in items are to. be embedded in <br /> cores of hollow masonry units, place a layer of metal lath in the joint below <br /> and rod mortar or grout into core . <br /> 2 . Fill cores in hollow concrete masonry units with grout 3 courses (24 " ) under <br /> bearing plates, beams, lintels , posts and similar items, unless otherwise <br /> indicated . <br /> 3 . 04 MORTAR BEDDING AND JOINTING <br /> A. Lay hollow concrete masonry units with full mortar coverage on horizontal and <br /> vertical face shells . Bed webs in mortar in starting course on footings and in all <br /> courses of piers, columns and pilasters , and where adjacent to cells or cavities to be <br /> reinforced or filled with concrete or grout. For starting course on footings where <br /> cells are not grouted, spread out full mortar bed including areas under cells . <br /> 04200-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.