' At closeout time clean or r « <br /> reclean entire work to normal level for first class <br /> maintenance/cleaning of building projects of a similar nature . Remove non-permanent <br /> ' protection and labels , polish glass , clean exposed finished, touch-up minor finish damage, <br /> clean or replace filters of mechanical systems , remove debris and broom-clean non- <br /> ' occupied spaces , sanitize plumbing facilities, clean light fixtures and replace burned- <br /> out/dimmed lamps, sweep and wash paved areas , police yards and grounds to the property <br /> line, and perform similar cleanup operations needed to produce a "clean" condition as <br /> ' determined by Architect and Owner' s Representative, <br /> 3 . 02 PROCEDURES AT SUBSTANTIAL COMPLETION <br /> ' A. Prerequisites : Comply with General Conditions and complete the following before <br /> requesting the Architect ' s inspection of the work, or designated portion thereof, for <br /> tsubstantial completion : <br /> Complete installation of building and equipment to such level as the Owner could, <br /> ' if necessary, occupy the facilities . <br /> Submit executed warranties , workmanship bonds , maintenance agreements, <br /> ' inspection certificates and similar required documentation for specific units of <br /> work, enabling Owner' s unrestricted occupancy and use . <br /> ' Complete instruction of Owners operating personnel , and start-up of systems . <br /> ' Complete final cleaning, and remove temporary facilities and tools . <br /> Be Inspection Procedures : Upon completion of Contractor ' s request for inspection the <br /> ' Architect will either proceed with inspection or advice Contractor of prerequisites <br /> not fulfilled . Following initial inspection, the Architect will either prepare <br /> certificate of substantial completion, or advise Contractor of work which must be <br /> ' performed prior to issuance of certificate ; and repeat inspection when requested and <br /> assured that work has been substantially completed . Results of completed <br /> inspection will form initial "punch-list" for final acceptance . <br /> 3 . 03 PROCEDURES AT FINAL ACCEPTANCE <br /> ' Upon receipt of Contractor' s notice that work has been completed, including punch-list <br /> items resulting from earlier inspections , and excepting incomplete items delayed because <br /> of acceptable circumstances , the Architect will reinspect the work. Upon completion of <br /> ' reinspection the Architect will either recommend final acceptance and final payment, or <br /> advise contractor of work not completed or obligations not fulfilled as required for final <br /> acceptance, if necessary, procedure will be repeated . <br /> ' <br /> * * * END OF SECTION * * * <br /> 01700-2 <br />