My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRASER ENGINEERING AND TESTING, INC . <br /> 3504 INDUSTRIAL 33RD STREET • FT. PIERCE, FLORIDA 34946 • TELEPHONE (561 ) 461 -7508 • FAX (561 ) 461 -8880 <br /> June 15 , 1999 <br /> Indian River County Public Works Department <br /> Attention: Mr . Chris Kafer, P . E . <br /> 1840 25" Street <br /> Vero Beach, Florida 32960-3365 <br /> Re : Proposed North County Regional Park <br /> Indian River County Project No . 9926 <br /> FET Job# : D-00262 <br /> Ladies and Gentlemen : <br /> The following is our report of the subsurface investigation for the above referenced project . The <br /> report presents our understanding of the project, the results of the field exploration program, our <br /> analysis of the foundation conditions, and recommendations for design bearing pressures and site <br /> preparation. <br /> SITE AND PROJECT DESCRIPTION <br /> The site is on the north side of CR 512 just west of the Sebastian River Middle School property. The <br /> site is relatively flat and is currently undeveloped pasture land with tall grass, scattered trees and some <br /> light brush. <br /> In the southeast corner of the site there will be a shallow activity pool, an Olympic pool/diving facility <br /> and a pool house . There will also be paved and grass parking and associated paved roadways . <br /> In the south center portion of the site there will be a configuration of four baseball fields . There will <br /> be a two - story concession stand in the center of the ballfield area and a maintenance building at the <br /> south end of the ballfield area. <br /> In the northern portion of the site there will be a configuration of six soccer fields. There will be a <br /> playground area between the baseball fields and the soccer fields. <br /> We understand that several feet of fill will be placed in the areas of the pools and buildings and in the <br /> roadway/parking areas. The ballfield and soccer areas will also be filled. <br /> There will seven lakes on the project and the soil to be excavated from the lakes will be used as site <br /> fill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.