My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Public Works Department <br /> Proposed North County Regional Part: <br /> June 15 , 2000 <br /> the footing grade should be a minimum of 95 % density. If the bottom of the footing has been <br /> ' loosened during excavation, the footing area should be compacted with a heavy plate vibratory <br /> compactor. Sufficient compactive effort should be applied to achieve the 95 % density. <br /> ' Pool Decks <br /> The earth walls of the pool excavation usually extend out a few feet from the pool walls into the deck <br /> area. It is essential the entire depth of the backfill placed in this area is compacted to 95 % density <br /> per ASTM D- 1557 . <br /> Groundxlater <br /> Heavy rainfall and/or a high water table may occur before the earthwork commences, or during the <br /> iearthwork operation. When these conditions occur and the site preparation cannot be achieved as <br /> specified. an evaluation of the existing conditions should be conducted and the specifications revised <br /> accordingly. <br /> On-Site Inspection <br /> We recommend that the site preparation and subsequent earthwork be monitored by a qualified soils <br /> technician. The soils technician should be responsible to observe the compaction of the building and <br /> pavement areas, determine the suitability of the fill and backfill, and take representative density tests <br /> on the prepared surface, fill, backfill, and footing excavations. <br /> PAVEMENT AREA PREPARATION RECOMMENDATIONS <br /> Pavement Area Preparation and Earthwork <br /> The pavement areas should be cleared of all trees, roots, surface vegetation, and any other deleterious <br /> matter to 3 feet outside of the proposed paved areas. After clearing, the area should be graded to an <br /> even grade and then compacted with a self-propelled steel drum vibratory roller having a minimum <br /> total applied force of 10 tons . Sufficient compactive effort should be applied to obtain a minimum <br /> ' of 95 % density per ASTM D- 1557 for a depth of 2 feet . The vibratory roller should make a <br /> minimum of 6 overlapping passes, 3 in one direction, and 3 in a direction at right angles over the <br /> ' entire cleared area. Soil density tests should be taken in the upper 2 feet prior to fill placement . If <br /> any unstable soil conditions or soft areas are encountered during compaction operations, the project <br /> engineer, geotechnical consultant or other responsible professional should be informed, the matter <br /> ' investigated and a resolution determined. <br /> ' 4 Fraser Engineering and Testing, Inc . <br />
The URL can be used to link to this page
Your browser does not support the video tag.