My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013 B of 3)
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013 B of 3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2016 2:21:19 PM
Creation date
9/30/2015 7:12:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013A
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park,Phase 2 Contract and Specifications
Volume 1
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3588
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> ' 2 . 05 Before Starting Construction <br /> Paragraph 2 .06.A has been deleted and replaced with a <br /> A. CONTRACTOR 's Review of Contract Documents: new paragraph. See the Supplementary Conditions. <br /> ' Before undertaking each part of the Work, 2 . 06 Preconstruction Conference <br /> CONTRACTOR shall carefully study and compare the <br /> Contract Documents and check and verify pertinent figures A. Within 20 days i #o-- the r xtract Taco-s.am— <br /> v <br /> therein and all applicable field measurements, ran, bu4 before e • \eEk •• t the Site ♦ .+ d eanfer-enee <br /> Y411' VLL\ Ml LLLV LT1GV • I <br /> CONTRACTOR shall promptly report in writing to attended by CONTRACTGG� ELNGDMEPL, and others-as <br /> ENGINEER any conflict, error, ambiguity, or discrepancy appropriate will—be held -to establish a wax <br /> which CONTRACTOR may discover and shall obtain a understanding a mengtthe-parties as to the Work and <br /> to <br /> t written interpretation or clarification from ENGINEER diseuss the sehedules referred to graph <br />205 .B-, <br /> before proceeding with any Work affected thereby; pFeeedufes for- handliRg-Shap Dr-awings and ath <br /> however, CONTRACTOR shall not be liable to OWNER submittals, processing mer Payment, and <br /> ' or ENGINEER for failure to report any conflict, error, . <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known 2 . 07 Initial Acceptance of Schedules <br /> thereof. <br /> ' A. Unless otherwise provided in the Contract Docu- <br /> B . Preliminary Schedules: Within ten days after the ments, at least ten days before submission of the <br /> first <br /> Effective Date of the Agreement (unless otherwise specified Application for Payment a conference attended by CON- <br /> in the General Requirements), CONTRACTOR shall TRACTOR, ENGINEER, and others as appropriate will be <br /> submit to ENGINEER for its timely review: held to review for acceptability to ENGINEER as provided <br /> below the schedules submitted in accordance with <br /> 1 . a preliminary progress schedule indicat- paragraph 2 . 05 .B . CONTRACTOR shall have an <br /> ' ing the times (numbers of days or dates) for starting additional ten days to make corrections and adjustments and <br /> and completing the various stages of the Work, to complete and resubmit the schedules. No <br /> progress <br /> including any Milestones specified in the Contract payment shall be made to CONTRACTOR until acceptable <br /> ' Documents; schedules are submitted to ENGINEER. <br /> 2 . a preliminary schedule of Shop Drawing 1 . The progress schedule will be acceptable <br /> and Sample submittals which will list each required to ENGINEER if it provides an orderly progression <br /> ' submittal and the times for submitting, reviewing, of the Work to completion within any specified <br /> and processing such submittal; and Milestones and the Contract Times . Such accep- <br /> tance will not impose on ENGINEER responsibility <br /> ' 3 . a preliminary schedule of values for all of for the progress schedule, for sequencing, schedul- <br /> the Work which includes quantities and prices of ing, or progress of the Work nor interfere with or <br /> items which when added together equal the Contract relieve CONTRACTOR from CONTRACTOR' s <br /> ' Price and subdivides the Work into component parts full responsibility therefor. <br /> in sufficient detail to serve as the basis for progress <br /> payments during performance of the Work. Such 2 . CONTRACTOR' s schedule of Shop <br /> prices will include an appropriate amount of Drawing and Sample submittals will be acceptable <br /> ' overhead and profit applicable to each item of to ENGINEER if it provides a workable <br /> Work. arrangement for reviewing and processing the <br /> required submittals . <br /> ' Paragraph 2 .05.0 has been deleted and replaced with a <br /> new paragraph. See the Supplementary Conditions. 3 . CONTRACTOR's schedule of values <br /> G . Aidienee of hisumnee: Befere-any Work at the will be acceptable to ENGINEER as to form and <br /> Site is staAed , G0*T%R2RAGT0R and OVRn ,✓v shall eae substance if it provides a reasonable allocation of the <br /> ' <br /> deliver- to he tithe. •:.t!' ee ies to sash additional insum� Contract Price to component parts of the Work. <br /> , • VVil1VJ-L <br /> ide«.tifed in the_ Cuppleme«ter• • Conditions, ee•+ifieetes eF <br /> insuFanee (and .,then eyideme ..f insu fe.•ee •• l.iel. either ..f <br /> ' them er any additional su fed may reasenabl. • request) <br /> whish GOTA RAG;FOP .r-a ER rzespeetively—aro <br /> regt4ed tepureb.ase and ma44aht ire--aEEerA.M.Ee <br /> A .+iele 5 . <br /> ' 00700 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.