My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013 B of 3)
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013 B of 3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2016 2:21:19 PM
Creation date
9/30/2015 7:12:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013A
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park,Phase 2 Contract and Specifications
Volume 1
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3588
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Site is based on information and data furnished to OWNER attributable to the existence or location of <br /> any <br /> or ENGINEER by the owners of such Underground Facili- Underground Facility that was not shown or <br /> ties, including OWNER, or by others. Unless it is otherwise indicated or not shown or indicated with reasonable <br /> expressly provided in the Supplementary Conditions : accuracy in the Contract Documents and that <br /> CONTRACTOR did not know of and could not <br /> 1 . OWNER and ENGINEER shall not be reasonably have been expected to be aware of or to <br /> ' responsible for the accuracy or completeness of any have anticipated. If OWNER and CONTRACTOR <br /> such information or data; and are unable to agree on entitlement to or on the <br /> amount or extent, if any, of any such adjustment in <br /> ' 2 . the cost of all of the following will be Contract Price or Contract Times, OWNER <br /> or <br /> included in the Contract Price, and CONTRACTOR CONTRACTOR may make a Claim therefor as <br /> shall have full responsibility for: provided in paragraph 10. 05 . <br /> ' a. reviewing and checking all such informa- 4 . 05 Reference Points <br /> tion and data, <br /> A. OWNER shall provide engineering surveys to <br /> b . locating all Underground Facilities establish reference points for construction which in <br /> shown or indicated in the Contract Documents, ENGINEER' s judgment are necessary to enable CON- <br /> TRACTOR to proceed with the Work. CONTRACTOR <br /> c. coordination of the Work with the shall be responsible for laying out the Work, shall protect <br /> ' owners of such Underground Facilities, and preserve the established reference points and property <br /> including OWNER, during construction, and monuments, and shall make no changes or relocations <br /> without the prior written approval of OWNER. <br /> d. the safety and protection of all such CONTRACTOR shall report to ENGINEER whenever any <br /> Underground Facilities and repairing any reference point or property monument is lost or destroyed or <br /> damage thereto resulting from the Work. requires relocation because of necessary changes in grades <br /> or locations, and shall be responsible for the accurate <br /> ' B . Not Shown or Indicated replacement or relocation of such reference points or <br /> property monuments by professionally qualified personnel. <br /> 1 . If an Underground Facility is uncovered <br /> or revealed at or contiguous to the Site which was 4 . 06 Hazardous Environmental Condition at Site <br /> not shown or indicated, or not shown or indicated <br /> with reasonable accuracy in the Contract A. Reports and Drawings: Reference is made to the <br /> Documents, CONTRACTOR shall, promptly after Supplementary Conditions for the identification of those <br /> becoming aware thereof and before further reports and drawings relating to a Hazardous Environmental <br /> disturbing conditions affected thereby or performing Condition identified at the Site, if any, that have been <br /> any Work in connection therewith (except in an utilized by the ENGINEER in the preparation <br /> of the <br /> emergency as required by paragraph 6 . 16.A), Contract Documents. <br /> identify the owner of such Underground Facility and <br /> give written notice to that owner and to OWNER B . Limited Reliance by CONTRACTOR on Technical <br /> ' and ENGINEER. ENGINEER will promptly review Data Authorized: CONTRACTOR may rely upon the <br /> the Underground Facility and determine the extent, general accuracy of the "technical data" contained in such <br /> if any, to which a change is required in the Contract reports and drawings, but such reports and drawings are not <br /> Documents to reflect and - document the Contract Documents . Such "technical data" is identified in <br /> ' consequences of the existence or location of the the Supplementary Conditions. Except for such reliance on <br /> Underground Facility. During such time, such "technical data," CONTRACTOR may not rely upon <br /> CONTRACTOR shall be responsible for the safety or make any Claim against OWNER, ENGINEER or any of <br /> ' and protection of such Underground Facility. ENGINEER' s Consultants with respect to : <br /> 2 . If ENGINEER concludes that a change in 1 . the completeness of such reports and <br /> the Contract Documents is required, a Work Change drawings for CONTRACTOR's purposes, including, <br /> Directive or a Change Order will be issued to reflect but not limited to, any aspects of the means, <br /> and document such consequences. An equitable methods, techniques, sequences and procedures of <br /> adjustment shall be made in the Contract Price or construction to be employed by CONTRACTOR <br /> Contract Times, or both, to the extent that they are <br /> 00700 - 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.