Laserfiche WebLink
' The determination of the appropriate method(s) of compliance is the complete and sole <br /> .� responsibility of the BIDDER. Such methods will not be checked by the OWNER or <br /> ENGINEER for accuracy, completeness or any other purpose . The OWNER and <br /> ENGINEER shall have no responsibility to review or check the BIDDER's compliance <br /> with the Trench Safety Standards . <br /> 8) The BIDDER, in submitting this bid , represents that it has obtained and considered all <br /> available geotechnical information , has utilized said geotechnical information and that , <br /> based on such information and the BIDDER's own information , the BIDDER has <br /> sufficient knowledge of the Project's surface and subsurface site conditions and <br /> ' { characteristics to assure BIDDER's compliance with the applicable Trench Safety <br /> Standards in designing the trench safety system(s) for the Project. <br /> BIDDER: S3 CPzN G, <br /> f . <br /> r By: [ILP <br /> f Position or Title : <br /> ` Date: ZJJ 7/1-31 <br /> tF STATE O F <br /> i <br /> COUNTY OF _ _ 1 � bA1J o47r <br /> ' Personally appeared before me , the undersigned authority, ,+ <br /> who after first beinq sworn by me, affixed his/her signature in the space provided above on this <br /> I an da of <br /> y 6 c �= , 201 <br /> I <br /> ,t =SDD <br /> LINGERry orida <br /> Public, a e My Id <br /> 87 <br /> 2State of ! 20058767 <br /> My Commission Exp 0411 951174� ThrN spany Inc. <br /> f ; <br /> t <br /> V * * END OF SECTION <br /> �. 00454 - 2 0399-00454 - Florida Trench Safety Act.doc.� <br /> F.1Englneedn"pital Pmjects%0399 North County Regional Park, Phase 1110399 Contract Oocs10399.00454 - Florida Trench Safety Act.doc Rev. 05101 <br />