Laserfiche WebLink
Scope of Work <br /> Bobby ' s Plumbing, Inc . <br /> Old Fellsmere School <br /> ( 1 ) Installation of new water and wastewater piping to restore and <br /> rehabilitate the existing restrooms (second floor) . These restrooms <br /> have been configured to provide ADA (Americans with Disabilities <br /> Act) stalls . The plumbing will be preliminary (rough- in) with no <br /> fixtures included . Wastewater lines will be Schedule 40 and water <br /> lines will be Type L copper. <br /> (2) Installation of new water lines and wastewater lines will be provided <br /> for new restrooms on third floor. This work will be preliminary <br /> (rough4n) with no fixtures included. Wastewater lines will be <br /> Schedule 40 and water lines will be Type L copper. <br /> (3 ) Material and labor guaranteed for one ( 1 ) year. <br /> (4) Price to completer work shall be a lump sum of $ 13 , 900 . 00 . <br /> ATTACHMENT A <br />