My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-258B
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-258B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 2:08:02 PM
Creation date
9/30/2015 6:56:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2003
Control Number
2003-258B
Agenda Item Number
11.C.3
Entity Name
Bobby's Plumbing, Inc. Agreement
Subject
Old Fellsmere School
Archived Roll/Disk#
3207
Supplemental fields
SmeadsoftID
3436
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> Bobby ' s Plumbing, Inc . <br /> Old Fellsmere School <br /> ( 1 ) Installation of new water and wastewater piping to restore and <br /> rehabilitate the existing restrooms (second floor) . These restrooms <br /> have been configured to provide ADA (Americans with Disabilities <br /> Act) stalls . The plumbing will be preliminary (rough- in) with no <br /> fixtures included . Wastewater lines will be Schedule 40 and water <br /> lines will be Type L copper. <br /> (2) Installation of new water lines and wastewater lines will be provided <br /> for new restrooms on third floor. This work will be preliminary <br /> (rough4n) with no fixtures included. Wastewater lines will be <br /> Schedule 40 and water lines will be Type L copper. <br /> (3 ) Material and labor guaranteed for one ( 1 ) year. <br /> (4) Price to completer work shall be a lump sum of $ 13 , 900 . 00 . <br /> ATTACHMENT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.