My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-258C
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-258C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 2:08:59 PM
Creation date
9/30/2015 6:56:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2003
Control Number
2003-258C
Agenda Item Number
11.C.3
Entity Name
Care-Full Air Conditioning, Inc.
Subject
Old Fellsmere School
Archived Roll/Disk#
3207
Supplemental fields
SmeadsoftID
3437
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENTo 3 `d'sy <br /> THIS AGREEMENT made and entered into this 29th day of September, 2003 , by and between Care-Full <br /> Air Conditioning, Inc. , hereinafter called the CONTRACTOR and INDIAN RIVER COUNTY herein <br /> called the OWNER. <br /> WITNESSED : That whereas, the OWNER and the CONTRACTOR for the consideration hereinafter <br /> named, agree as set forth below: <br /> Article 1 . SCOPE OF WORK <br /> As per specifications attached hereto identified as Attachment A. <br /> CONTRACTOR, as an independent CONTRACTOR and not as an employee, shall furnish, for the sum of <br /> Sixty Five Thousand Dollars ($65 ,000 . 00), all of the necessary labor, material, and equipment to perform <br /> the work described in accordance with the Scope of Work and Contract Documents , <br /> Article 2 . TIME OF COMPLETION <br /> 120 Calendar Days from receipt of the execution of this agreement. <br /> Article 3 . GENERAL <br /> The CONTRACTOR hereby certifies that he has read every clause of the Contract Documents and that he <br /> has made such examination of the location of the proposed work as is necessary to understand fully the <br /> nature of the obligation herein made ; and shall complete the same the time limit specified herein in <br /> accordance with the plans and specifications. <br /> The CONTRACTOR agrees to utilize to the greatest extent possible all existing ducts, chase or pipes to <br /> avoid the least alteration possible to building ' s historical materials, appearance and character. To insure <br /> the maximum compliance with historical concerns, CONTRACTOR agrees to coordinate all work with <br /> Architect and Restoration Historian using the Standards for Historic Preservation as set forth by the <br /> Secretary of the Interior. <br /> The OWNER and CONTRACTOR agree to maintain records, invoices, and payments for the work. All <br /> work under this Contract shall be done to the satisfaction of the OWNER, who shall in all cases determine <br /> the amount, quality, fitness, and acceptability of the several kinds of work and materials which are to be <br /> paid for hereunder, and shall decide all questions which may arise as to fulfillment of the Contract on the <br /> part of the CONTRACTOR, and his decision thereon shall be final and conclusive ; and such <br /> determination and decision, in case any question shall arise, shall be a condition precedent to the right of <br /> the CONTRACTOR to receive any money hereunder. <br /> Any clause or section of this contract or specification which may for any reason be declared invalid by a <br /> court of competent jurisdiction, including appeal, if any, may be eliminated therefrom; and the intent of <br /> this Contract and the remaining portion thereof will remain in full force and effect as though such invalid <br /> clause or section has not been incorporated therein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.