Laserfiche WebLink
The Fellsmere School Restoration Project Stage l Equipment List is as follows : <br /> Condensing Units <br /> 3 3& 1 /2 Ton 13 HPB (Heat Pump) <br /> 2 3 Ton 13 HPB (Heat Pump) <br /> 2 1 & 1 /2 Ton HP 29 (Heat Pump) <br /> 2 5 Ton 13 HPB (Heat Pump) <br /> Air Handlers <br /> 4 3 & 1 /2 Ton CB30M46 <br /> 1 4 Ton CB30M-51 <br /> 2 2 Ton CB30M-21 /26 <br /> 2 5 Ton CB30M-65 <br /> All the above air handlers will have emergency strip heaters installed <br /> Thermostats . . . . . <br /> 9 Thermostats with remote sensors as needed. <br /> Smoke Detectors . . . <br /> 9 Smoke Detectors with remote annuciators as Wire, needed. <br /> Control re. . . (APPO,;k <br /> Thermostat wire and etc, for air handlers and detectors as needed . <br /> Hanging Hardware <br /> Threaded Rod . . . Unistrut . . . . Chain . . . "S"Hooks . . . as needed. <br /> Refrigerant Piping <br /> 7/8 Copper Tubing <br /> 3/8 Copper Tubing �A fpncc % OoQo Pcr <br /> 1 & 1/8 Copper Tubing <br /> 3/4 Copper Tubing <br /> Tubing to be installed as per manufacturer' s specifications. All Suction lines will be <br /> insulated with "Rubatex" or equivalent. <br /> Condensate Lines <br /> 3/4 and 1 " or other as needed . CA R,tio, , <br /> All equipment will be hung and strapped as per industry standards or local codes <br /> whichever is greater. <br /> Supply & Returns <br /> All conditioned spaces will be provided with ceiling or side-wall supply grilles <br /> and/or registers as needed <br /> Ducts <br /> All rigid fiberglass ducting and all flexable ducting and their connectors will be <br /> provided by contractor. All supply and return ducts will be sealed with mastic. Ducts <br /> will be hung and supported according to code. <br /> At the present time, there are still modifications that are being considered with respect to <br /> this Phase on the third floor. We believe, however that they will not affect the over-all <br /> cost as per estimate. <br /> 0 Po <br /> AAA <br />