My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-258C
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-258C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 2:08:59 PM
Creation date
9/30/2015 6:56:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/23/2003
Control Number
2003-258C
Agenda Item Number
11.C.3
Entity Name
Care-Full Air Conditioning, Inc.
Subject
Old Fellsmere School
Archived Roll/Disk#
3207
Supplemental fields
SmeadsoftID
3437
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Fellsmere School Restoration Project Stage l Equipment List is as follows : <br /> Condensing Units <br /> 3 3& 1 /2 Ton 13 HPB (Heat Pump) <br /> 2 3 Ton 13 HPB (Heat Pump) <br /> 2 1 & 1 /2 Ton HP 29 (Heat Pump) <br /> 2 5 Ton 13 HPB (Heat Pump) <br /> Air Handlers <br /> 4 3 & 1 /2 Ton CB30M46 <br /> 1 4 Ton CB30M-51 <br /> 2 2 Ton CB30M-21 /26 <br /> 2 5 Ton CB30M-65 <br /> All the above air handlers will have emergency strip heaters installed <br /> Thermostats . . . . . <br /> 9 Thermostats with remote sensors as needed. <br /> Smoke Detectors . . . <br /> 9 Smoke Detectors with remote annuciators as Wire, needed. <br /> Control re. . . (APPO,;k <br /> Thermostat wire and etc, for air handlers and detectors as needed . <br /> Hanging Hardware <br /> Threaded Rod . . . Unistrut . . . . Chain . . . "S"Hooks . . . as needed. <br /> Refrigerant Piping <br /> 7/8 Copper Tubing <br /> 3/8 Copper Tubing �A fpncc % OoQo Pcr <br /> 1 & 1/8 Copper Tubing <br /> 3/4 Copper Tubing <br /> Tubing to be installed as per manufacturer' s specifications. All Suction lines will be <br /> insulated with "Rubatex" or equivalent. <br /> Condensate Lines <br /> 3/4 and 1 " or other as needed . CA R,tio, , <br /> All equipment will be hung and strapped as per industry standards or local codes <br /> whichever is greater. <br /> Supply & Returns <br /> All conditioned spaces will be provided with ceiling or side-wall supply grilles <br /> and/or registers as needed <br /> Ducts <br /> All rigid fiberglass ducting and all flexable ducting and their connectors will be <br /> provided by contractor. All supply and return ducts will be sealed with mastic. Ducts <br /> will be hung and supported according to code. <br /> At the present time, there are still modifications that are being considered with respect to <br /> this Phase on the third floor. We believe, however that they will not affect the over-all <br /> cost as per estimate. <br /> 0 Po <br /> AAA <br />
The URL can be used to link to this page
Your browser does not support the video tag.