Laserfiche WebLink
r <br /> MEMORANDUM <br /> April 11 , 2003 <br /> Page Two <br /> • ATTACHMENT B : ected <br /> Draft Scope of Work — In the blanks provided, insert xp <br /> the e <br /> time frame and estimated cost necessary to complete each deliverable. The cost for the <br /> deliverable should reflect both the federal and local shares . Then fill in the cost <br /> breakdown portion of the draft Scope of Work, which follows the description of the final <br /> deliverable . <br /> • ATTACHMENT C ; In-kind Service Labor Summary <br /> track local labor used as in-kind services by the Grantee <br /> e A cop— This form is used to <br /> y must be <br /> each invoice to document the use of in-kind services to meet the local atchreqeq mitted with <br /> requirement. <br /> • ATTACHMENT D : Local Mitigation Plan Criteria, Score- Sheet & Crosswalk — This <br /> form, with the appropriate Section and page numbers filled <br /> revised plan when submitted for review. The DEM and the in, <br /> must Emerggeency the <br /> Management Agency (FEMA) will use it as the Score- Sheet. <br /> • ATTACHMENT Es Draft Local Mitigation Plan <br /> MinimumRegion IV —FEMA Region IV ' smnStandards of Acceptabilityiimm <br /> standards for reviewing local mitigation plans. <br /> If you are interested in participating in this program, please return a signed Planning <br /> Grant Application Form (Attachment A) and a completed copy of the Draft Scope of Work <br /> (Attachment B) described above to : <br /> Mr. Hank Erikson, Planning Manager <br /> Division of Emergency Management <br /> 2555 Shumard Oak Blvd, <br /> Tallahassee, FL 32399-2100 <br /> hank. erikson@dca . state. fl.us <br /> Office : 850.413 -9873 <br /> Remember that these Planning Grant Applications and Draft Scopes of Work will only be <br /> accepted through June 13 , 2003 , <br /> WCF :heg <br /> Attachments <br /> ty EmerManagement cc : Coun �genc y v cement Directors <br />