My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-178A
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-178A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 12:21:16 PM
Creation date
9/30/2015 6:41:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/22/2003
Control Number
2003-178A
Agenda Item Number
11.I.2
Entity Name
Florida Power & Light FPL
Subject
Underground Conduit Agreement
Project Number
WR#526272
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3317
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UCD TARIFF ESTIMATE (UCD Tariff Effective: 05121120021 MNL DATE: 6/19/03 <br /> PROJECT: L_.. LOCATION: <br /> DESIGNER <br /> OF UNITS <br /> # OF UNITS CHARGES il CREDITS <br /> (13.2.12.a) Primary lateral riser ( if from overhead termination point), pad mounted transformer and trench with cable-lnconduit <br /> not to exceed 150 feet for radials and 300 feet for loops. <br /> From Overhead Termination Point From Existing Underground Termination Point <br /> (13.2.12.a.1 ) Single Phase Radial $561 X qty NIA Use Loop Price X qty $ <br /> (13.2.12.a.2) Two Phase Radial $1 ,121 X qty N/A Use Loop Price X qty <br /> (13.2.12.a.3) Three Phase Radial - 150KVA $737 X qty NIA Use Loop Price X qty _ <br /> (13.2.12.a.4) Three Phase Radial - 300 KVA $0 X <br /> (13.2.12.a.5) Single Phase loop $1 ,430 X - qty NIA Use Loop Price X qty 1 <br /> qty S910 X qty g <br /> (13.2.12.a.6) Two Phase Loop $2,434 X qty $1 ,667 X qty g <br /> (13.2.12.a,7) Three Phase Loop $1 ,239 X qty $574 X qty E <br /> (13.2.12.b) Secondary riser and lateral, excluding handhole orjunction box, with connection to Applicant's service cables <br /> no greater than 20 feet from Company riser pole. <br /> (13.2.12.b.1 ) Small Single Phase 410 TPX or smaller $406 X riser(s) <br /> (13.2.12.b.2) Large Single Phase larger than 410 TPX $581 X riser(s) <br /> (13.2.12.b.3) Snell Three Phase 410 qPX or smaller $508 X riser(s) S 508.00 <br /> (13.2.12.b.4) Large Three Phase larger than 410 qPX $844 X I,% ; ' riser(s) g <br /> (13.2.12.c) Handholes and Padmounted Secondary Junction Boxes, excluding connections. <br /> (13.2.12.c.1 ) Handholes <br /> (13.2.12.c.1 .a) Small 24" handhole $143 X1 hh(s) $ 143.00 <br /> (13.2.12.c.1 .b) Intermediate 30" handhole $214 X hh(s) g <br /> (13.2.12.c.2) Pad <br /> rat dJunctiohandhole $583 X hh(s) <br /> (13.2.12.c.2) Pad Mounted Junction Box (PM TX Dummy 51 ,489 X box(s) <br /> Cabinet M&S #16110000-7) <br /> (13.2.12.d) Primary Splice Box including splices and cable pulling set-up <br /> (13.2.12.d.1 ) Single Phase per box 1943 X : - . _ box(s) <br /> (13.2.12.d.2) Two Phase per box 1 ,302 X box(s) <br /> $ - <br /> (13.2.12.d.3) Three Phase per box 51 ,433 X box(s) $ <br /> (13.2.12.e) Additional installation charge for underground primary laterals including trench and cableinconduit which exceeds <br /> the limits set in 13.2.12.a to reach FPL designated point of delivery. <br /> (13.2.12.e.1) Single Phase per foot $1 .43 X ft. <br /> ( 3.2.12.e.2) Two Phase per foot $3.02 X k. <br /> (I3.2.12.8.3) Three Phase per foot $3.58 X 1, 1 �j ft. g <br /> (13.2.12.f) Additional installation charge for underground primary laterals including trench and cableanconduit extended <br /> beyond the FPL designated point of delivery. <br /> (13.2.12.f.1 ) Single Phase per foot $5.02 X k. <br /> (13.2.12.f.2) Two Phase per foot $7.63 X k. <br /> (13.2.12.f.3) Three Phase per foot $9.17 X k $ <br /> $ <br /> (13.2.12.g) UG Feeder <br /> (13.2.12.g) 1000 (not including switch package) $10.90 X ft. <br /> (13.2.12.g) Switchh packpackage (9/3 per package) $79,290 X ea. <br /> (13.2.12.g) Switch package (616 per package) 5191290 X e8, $ - <br /> E <br /> (13.2.13.a) Trench and backfilling credits <br /> (13.2.13.a.1 ) Credit perfoot of primary trench $1.80 X 110 ft. $ 198.00 <br /> (13.2.13.a.2) Credit per foot of secondary trench $1 .50 X <r: ,y '-+ k. $ <br /> (I 3.2.13.b) Pvt installation credits <br /> (13.2.13.b.1 ) Credit per foot of 2" pvc 80.32 X ft. <br /> (I 3.2.13.b.2) Credit per foot of 5" pvc $0.44 X <br /> S 48.40 <br /> (13.2.13.c) Handhole / primary splice box installation credits <br /> (13.2.13.c.1 ) Credit per large hh (greater than 30") / pri splice box $123 X hh(s) g <br /> (13.2.13.c.2) Credit per small I intermediate hh (30" or less) $32 X hh(s) <br /> (13.2.13.d) Transformer pad installation credits <br /> (13.2.13.d.) Credit per pad $19 X 0 pad(s) <br /> Feeder Splice Box Credit (FDR BOX-07-060) $466 X 1 ea. <br /> Padmount Switch Chamber Creditdit (FD(FDRSWPAD-07860) $298 X ea. g <br /> Additional Charges (e.g. non-rapid trenching, restoration, etc.) 0 <br /> TOTAL CONTRIBUTION: S 651 .00 <br /> LESS TOTAL CREDITS: $ 246.40 <br /> TOTAL CASH PAYMENT: 1 404.60 <br /> TOTAL CUSTOMER PAYMENT $ 651 .00 <br /> (CONTRIBUTION MAT + LABOR) S 246.40 <br /> (Miscellaneous Trench Purchase must be used if credits exceed total contribution amount. Inventory on work order see SPO 21450.2) S _ <br /> (CONTRIBUTION CASH) $ 404.60 <br /> 6118/03 5:14 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.