My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-031
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2016 11:09:48 AM
Creation date
9/30/2015 6:17:24 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and employees against all claims, losses, and liabilities, (specifically excluding attorneys' fees and <br /> expenses) caused solely by the negligent acts or omissions of the Permittee, its employees, and <br /> elected officials arising out of,under,or in connection with,the Permittee's performance under this <br /> Agreement. Nothing contained herein shall be deemed or construed to provide,directly or indirectly, <br /> an indemnity from the Permittee for any negligent acts or omissions of the District, its agents and <br /> employees arising out of, under, or in connection with this Agreement. <br /> 6. Permittee is cautioned that electrical, water, sewer, gas or other installations or <br /> utilities may be located within the permit area,and Permittee shall use diligent efforts to first detect <br /> and locate all such installations and shall coordinate construction with all other lawful users of said <br /> right-of-way. Permittee shall be liable for all damages proximately resulting from its interference <br /> with or interruption of services provided by other lawful right-of-way users. <br /> 7. The District may,on thirty days'written notice to the Permittee,require cessation of use <br /> into District's facilities, removal or alteration of any installation or construction on District <br /> right-of-way. <br /> 8. Any construction on District right-of-way or property and cleanup shall be completed <br /> promptly by Permittee and in a workmanlike manner with minimum disturbance to existing berm, <br /> channel slopes and grade with proper restoration and planting of any disturbed areas to prevent <br /> erosion within ten days after completion of construction or installation. <br /> 9. The Permittee shall at all times maintain cable markers above ground at 100 foot intervals <br /> to show the location of any underground objects. The force main and shall be so constructed and <br /> installed to permit the crossing of heavy equipment used by the District for the maintenance of its <br /> laterals, sublaterals and canals and for any similar heavy equipment used by land owners within the <br /> District. In any case where the force main crosses a pipe or culvert used for drainage or irrigation <br /> purposes,or a pipe or culvert is needed hereafter for drainage or irrigation of adjacent lands,and the <br /> same is deemed by District or an adjacent landowner to be required to be installed, repaired or <br /> IRC-2 <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.