My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018A.
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 11:11:16 AM
Creation date
9/30/2015 8:08:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018A.
Agenda Item Number
7.M.
Entity Name
Kimley-Horn Associates, INc
Subject
documents and specifications for canal bridge replacement
Area
Oslo Road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4450
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If 10.05 Claims and Disputes <br />A. Notice: Written notice stating the general <br />nature of each Claim, dispute, or other matter shall be <br />y delivered by the claimant to ENGINEER and the other <br />party to the Contract promptly (but in no event later <br />than 30 days) after the start of the event giving rise <br />thereto. Notice of the amount or extent of the Claim, <br />dispute, or other matter with supporting data shall be <br />delivered to the ENGINEER and the other party to the <br />Contract within 60 days after the start of such event <br />(unless ENGINEER allows additional time for claimant <br />to submit additional or more accurate data in support <br />of such Claim, dispute, or other matter). A Claim for <br />an adjustment in Contract Price shall be prepared in <br />accordance with the provisions of paragraph 12.01.13. <br />A Claim for an adjustment in Contract Time shall be <br />prepared in accordance with the provisions of <br />paragraph 12.02.13. Each Claim shall be accom- <br />panied by claimant's written statement that the adjust- <br />ment claimed is the entire adjustment to which the <br />claimant believes it is entitled as a result of said event. <br />The opposing party shall submit any response to <br />ENGINEER and the claimant within 30 days after <br />receipt of the claimant's last submittal (unless <br />ENGINEER allows additional time). <br />B. ENGINEER's Decision: ENGINEER will <br />render a formal decision in writing within 30 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. ENGINEER's <br />written decision on such Claim, dispute, or other <br />matter will be final and binding upon OWNER and <br />CONTRACTOR unless: <br />C. If ENGINEER does not render a formal <br />decision in writing within the time stated in paragraph <br />10.05.13, a decision denying the Claim in its entirety <br />shall be deemed to have been issued 31 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. <br />D. No Claim for an adjustment in Contract Price <br />or Contract Times (or Milestones) will be valid if not <br />submitted in accordance with this paragraph 10.05. <br />ARTICLE 11 - COST OF THE WORK; CASH <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included: The term Cost of the Work <br />means the sum of all costs necessarily incurred and <br />paid by CONTRACTOR in the proper performance of <br />the Work. When the value of any Work covered by a <br />Change Order or when a Claim for an adjustment in <br />Contract Price is determined on the basis of Cost of <br />the Work, the costs to be reimbursed to <br />CONTRACTOR will be only those additional or <br />incremental costs required because of the change in <br />the Work or because of the event giving rise to the <br />Claim. Except as otherwise may be agreed to in <br />writing by OWNER, such costs shall be in amounts no <br />higher than those prevailing in the locality of the <br />Project, shall include only the following items, and <br />shall not include any of the costs itemized in para- <br />graph 11.01.13. <br />1. an appeal from ENGINEER's <br />decision is taken within the time limits and in 1. Payroll costs for employees in the <br />accordance with the dispute resolution direct employ of CONTRACTOR in the perfor- <br />procedures set forth in Article 16; or mance of the Work under schedules of job <br />classifications agreed upon by OWNER and <br />2. if no such dispute resolution CONTRACTOR. Such employees shall include <br />procedures have been set forth in Article 16, a without limitation superintendents, foremen, <br />written notice of intention to appeal from and other personnel employed full time at the <br />ENGINEER's written decision is delivered by Site. Payroll costs for employees not employed <br />OWNER or CONTRACTOR to the other and to full time on the Work shall be apportioned on <br />ENGINEER within 30 days after the date of the basis of their time spent on the Work. <br />such decision, and a formal proceeding is Payroll costs shall include, but not be limited to, <br />instituted by the appealing party in a forum of salaries and wages plus the cost of fringe <br />competent jurisdiction within 60 days after the benefits, which shall include social security <br />date of such decision or within 60 days after contributions, unemployment, excise, and <br />Substantial Completion, whichever is later payroll taxes, workers' compensation, health <br />(unless otherwise agreed in writing by OWNER and retirement benefits, bonuses, sick leave, <br />and CONTRACTOR), to exercise such rights or vacation and holiday pay applicable thereto. <br />remedies as the appealing party may have with The expenses of performing Work outside of <br />respect to such Claim, dispute, or other matter regular working hours, on Saturday, Sunday, or <br />in accordance with applicable Laws and legal holidays, shall be included in the above to <br />Regulations. the extent authorized by OWNER. <br />0 <br />00700 - General Conditions (EJCDC) <br />Page 31 of 44 <br />F:\Public Works\Capital <br />Projects\Oslo <br />Road Lateral J\BID DOCUMENTS\00700 - General Conditions <br />(EJCDC).doc <br />0 <br />00700 - General Conditions (EJCDC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.