My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018A.
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 11:11:16 AM
Creation date
9/30/2015 8:08:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018A.
Agenda Item Number
7.M.
Entity Name
Kimley-Horn Associates, INc
Subject
documents and specifications for canal bridge replacement
Area
Oslo Road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4450
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond satisfactory to OWNER to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling OWN- <br />ER <br />WN-ER to a set-off against the amount <br />recommended; or <br />d. OWNER has actual knowledge of the <br />occurrence of any of the events enumerated <br />in paragraphs 14.02.B.5.a through <br />14.02.B.5.c or paragraph 15.02.A. <br />2. If OWNER refuses to make payment <br />of the full amount recommended by <br />ENGINEER, OWNER must give <br />CONTRACTOR immediate written notice (with <br />a copy to ENGINEER) stating the reasons for <br />such action and promptly pay CONTRACTOR <br />any amount remaining after deduction of the <br />amount so withheld. OWNER shall promptly <br />pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />corrects to OWNER Is satisfaction the reasons <br />for such action. <br />3. If it is subsequently determined that <br />OWNER's refusal of payment was not justified, <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14.02.C.1. <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment covered <br />by any Application for Payment, whether incorporated <br />in the Project or not, will pass to OWNER no later than <br />the time of payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />' therefor. If ENGINEER considers the Work <br />substantially complete, ENGINEER will prepare and <br />deliver to OWNER a tentative certificate of Substantial <br />Completion which shall fix the date of Substantial <br />M <br />Completion. There shall be attached to the certificate <br />a tentative list of items to be completed or corrected <br />before final payment. OWNER shall have seven days <br />after receipt of the tentative certificate during which to <br />make written objection to ENGINEER as to any <br />provisions of the certificate or attached list. If, after <br />considering such objections, ENGINEER concludes <br />that the Work is not substantially complete, <br />ENGINEER will within 14 days after submission of the <br />tentative certificate to OWNER notify CONTRACTOR <br />in writing, stating the reasons therefor. If, after <br />consideration of OWNER's objections, ENGINEER <br />considers the Work substantially complete, <br />ENGINEER will within said 14 days execute and <br />deliver to OWNER and CONTRACTOR a definitive <br />certificate of Substantial Completion (with a revised <br />tentative list of items to be completed or corrected) <br />reflecting such changes from the tentative certificate <br />as ENGINEER believes justified after consideration of <br />any objections from OWNER. At the time of delivery <br />of the tentative certificate of Substantial Completion <br />ENGINEER will deliver to OWNER and CONTRAC- <br />TOR a written recommendation as to division of <br />responsibilities pending final payment between <br />OWNER and CONTRACTOR with respect to security, <br />operation, safety, and protection of the Work, <br />maintenance, heat, utilities, insurance, and warranties <br />and guarantees. Unless OWNER and <br />CONTRACTOR agree otherwise in writing and so <br />inform ENGINEER in writing prior to ENGINEER's <br />issuing the definitive certificate of Substantial Comple- <br />tion, ENGINEER's aforesaid recommendation will be <br />binding on OWNER and CONTRACTOR until final <br />payment. <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow CON- <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of <br />the Work, may be accomplished prior to Substantial <br />Completion of all the Work subject to the following <br />conditions. <br />1. OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />Page 40 of 44 <br />F:\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\00700 - General Conditions (EJCDC).doc <br />00700 - General Conditions (EJCDC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.