My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018A.
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 11:11:16 AM
Creation date
9/30/2015 8:08:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018A.
Agenda Item Number
7.M.
Entity Name
Kimley-Horn Associates, INc
Subject
documents and specifications for canal bridge replacement
Area
Oslo Road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4450
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />Im <br />Dated <br />By: <br />State of <br />County of <br />Subscribed and sworn to before me this <br />day of <br />Notary Public <br />My Commission expires: <br />(CONTRACTOR) <br />NOTICE OF NON-PAYMENT. If one or more "Notice of Non -Payment" or "Notice to <br />Owner" is received by the OWNER, no further payments will be approved until non- <br />payments) have been satisfied and a "Lien Waiver" for each "Notice" has been submitted <br />to the OWNER. Upon request, CONTRACTOR shall furnish acceptable evidence that all <br />such claims have been satisfied. The CONTRACTOR may, with consent of Surety and <br />indemnification of the OWNER against any claims, receive payment for work for which there <br />is an outstanding "Notice of Non -Payment" or "Notice to Owner." <br />CERTIFICATION OF ARCHITECT OR CONSULTING ENGINEER (WHERE APPLICABLEZ <br />I certify that I have checked and verify the above and foregoing Periodic Estimate for Partial <br />Payment; that to the best of my knowledge and belief it is a true and correct statement of the work <br />performed and/or material supplied by the Contractor. <br />Dated <br />(ARCHITECT/ ENGINEER) SIGNATURE <br />I have checked the estimate against the Contractor's Schedule of Amounts for ontrac <br />Payments and the notes and reports of my inspections of the project. It is my opinion that this <br />statement of work performed and/or materials supplied is accurate, that the Contractor is observing <br />the requirements of the Contract, and that the Contractor should be paid the amount requested <br />above. <br />Dated <br />Accompanying Documentation: <br />(ARCHITECT / ENGINEER) SIGNATURE <br />[The Remainder of Page Intentional Left Blank <br />00622 - Contractor's Application for Payment 2006041 <br />00622-2 <br />,., F:\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS 2006041\00622 -Contractor's Application for Payment 2006041.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.