My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018A.
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 11:11:16 AM
Creation date
9/30/2015 8:08:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018A.
Agenda Item Number
7.M.
Entity Name
Kimley-Horn Associates, INc
Subject
documents and specifications for canal bridge replacement
Area
Oslo Road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4450
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br />In <br />SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 120 <br />OWNER: Indian River County <br />CONTRACTOR• <br />Contract: <br />Project: Oslo Road (CR 606) / Lateral 'J' Canal Bridge Replacement <br />OWNER's Contract No. <br />ENGINEER's Project No. <br />CONTACT FOR: Oslo Road (CR 606) / Lateral 'J' Canal Bridge Replacement <br />(Insert Name of Contract as it appears in the Bid Documents) <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To: <br />And T <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within days <br />W of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion <br />00630-1 <br />.. FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\00630 - Certificate of Substantial Completion.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.