My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-309
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 2:22:58 PM
Creation date
9/30/2015 7:03:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/18/2003
Control Number
2003-309
Agenda Item Number
7.T.
Entity Name
Mid-State Mechanical of Vero Beach,Inc.
Subject
Chiller Replacement - Administration Building
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3501
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS <br /> SCOPE <br /> These Special Provisions shall supplement the General Conditions and shall govern purchases by the <br /> County of Indian River under these Specifications , except that technical specifications , if any, will <br /> govern if any conflict arises between such technical specifications and these Special Provisions . <br /> DESCRIPTION OF THE WORK/ALTERATIONS <br /> The work for this project shall consist of replacing an existing water cooled chiller with one air <br /> cooled chiller, new pump and modification to existing chilled water piping . <br /> Extra work: Without invalidating the contract, the OWNER may at any time , by written change order <br /> and without preliminary notice to the surety , order extra work within the general scope or alter the <br /> work by addition or reduction , and the contract price will be adjusted accordingly. <br /> Changes in work: The County shall have the right to suspend work wholly or in part for such period <br /> or periods as may be deemed necessary due to unsuitable weather or other conditions , which the <br /> County considers unfavorable for the work to proceed. No allowance of any kind will be made for <br /> such suspension of work except an equivalent time for completion of the contract . <br /> Changed conditions : If during the progress of work, field conditions are found to differ materially <br /> from those covered by the Specifications or from those , which could reasonably have been foreseen <br /> by the CONTRACTOR after examination of the site, the CONTRACTOR shall call such conditions <br /> to the attention of the OWNER and necessary changes will be made to the Specifications . If these <br /> changes entail extra work or materials and the value of such work has not been determined by unit <br /> price under the contract, the values of such work or change shall be determined by negotiation . The <br /> OWNER and CONTRACTOR shall execute a change order to the contract at mutually satisfactory <br /> unit prices or lump sums for any extra work, addition or deletion made necessary by such changed <br /> conditions and requested by the County . <br /> COMMENCEMENT OF WORK <br /> The work shall commence immediately upon receipt of a Notice to Proceed. <br /> TIME OF COMPLETION <br /> The work shall be completed within the time slated on the bid as time required to complete all work. <br /> Page 15 of 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.