My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Where CONTRACTOR is prevented from compensate CONTRACTOR due to delay, <br /> completing any part of the Work within the Contract interference, or disruption directly attributable to <br /> Times (or Milestones) due to delay beyond the control actions or inactions of OWNER or anyone for whom <br /> of CONTRACTOR, the Contract Times (or OWNER is responsible . <br /> Milestones ) will be extended in an amount equal to the <br /> time lost due to such delay if a Claim is made therefor <br /> ' as provided in paragraph 12 . 02 .A. Delays beyond the ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> control of CONTRACTOR shall include, but not be CORRECTION , REMOVAL OR ACCEPTANCE OF <br /> limited to , acts or neglect by OWNER, acts or neglect DEFECTIVE WORK <br /> of utility owners or other contractors performing other <br /> ' work as contemplated by Article 7 , fires , floods , <br /> epidemics , abnormal weather conditions , or acts of 13 . 01 Notice of Defects <br /> God . <br /> ' A. Prompt notice of all defective Work of which <br /> 12 . 04 Delays Within CONTRACTOR 's Control OWNER or ENGINEER has actual knowledge will be <br /> given to CONTRACTOR. All defective Work may be <br /> ' A. The Contract Times (or Milestones) will not be rejected , corrected , or accepted as provided in this <br /> extended due to delays within the control of Article 13 . <br /> CONTRACTOR. Delays attributable to and within the <br /> control of a Subcontractor or Supplier shall be 13 . 02 Access to Work <br /> ' deemed to be delays within the control of CONTRAC- <br /> TOR. A. OWNER, ENGINEER, ENGINEER's Con- <br /> sultants , other representatives and personnel of <br /> ' 12 . 05 Delays Beyond OWNER 's and OWNER, independent testing laboratories , and <br /> CONTRACTOR 's Control governmental agencies with jurisdictional interests will <br /> have access to the Site and the Work at reasonable <br /> A. Where CONTRACTOR is prevented from times for their observation , inspecting , and testing . <br /> completing any part of the Work within the Contract CONTRACTOR shall provide them proper and safe <br /> Times (or Milestones ) due to delay beyond the control conditions for such access and advise them of <br /> of both OWNER and CONTRACTOR, an extension of CONTRACTOR's Site safety procedures and <br /> the Contract Times (or Milestones ) in an amount programs so that they may comply therewith as <br /> equal to the time lost due to such delay shall be applicable . <br /> CONTRACTOR's sole and exclusive remedy for such <br /> delay. 13 . 03 Tests and Inspections <br /> 12 . 06 Delay Damages A. CONTRACTOR shall give ENGINEER timely <br /> notice of readiness of the Work for all required <br /> A. In no event shall OWNER or ENGINEER be inspections , tests , or approvals and shall cooperate <br /> ' liable to CONTRACTOR, any Subcontractor, any with inspection and testing personnel to facilitate <br /> Supplier, or any other person or organization , or to any required inspections or tests . <br /> surety for or employee or agent of any of them , for <br /> ' damages arising out of or resulting from : B . OWNER shall employ and pay for the <br /> services of an independent testing laboratory to <br /> 1 . delays caused by or within the control perform all inspections , tests , or approvals required by <br /> of CONTRACTOR; or the Contract Documents except: <br /> 2 . delays beyond the control of both 1 . for inspections , tests , or approvals <br /> OWNER and CONTRACTOR including but not covered by paragraphs 13 . 03 . 0 and 13 . 03 . D <br /> limited to fires , floods , epidemics , abnormal below; <br /> weather conditions , acts of God , or acts or <br /> neglect by utility owners or other contractors 2 , that costs incurred in connection with <br /> performing other work as contemplated by tests or inspections conducted pursuant to <br /> ' Article 7 . paragraph 13 .04 . B shall be paid as provided in <br /> said paragraph 13 .04 . 6 ; and <br /> B . Nothing in this paragraph 12 .06 bars a <br /> ' change in Contract Price pursuant to this Article 12 to <br /> 00700-37 <br /> 0386- 00700 - General Conditions <br /> F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General <br /> Conditions .doc <br />