Laserfiche WebLink
SECTION 01050 <br /> FIELD ENGINEERING AND LAYOUT <br /> 1 . 1 GENERALristruction staking for the project . All <br /> A . <br /> The CONTRACTOR will furnish all <br /> supervis onof a Florida Registered Land <br /> staking from control will be under <br /> Surveyor piling <br /> and make all detail surveys and mee stakesnbatterboards , p g <br /> ded for <br /> B . Develop but not limited to , slop <br /> construction including <br /> nt on the site at all times and a skilled <br /> layouts and all other working lines , elevations and cutsheets . <br /> ' Y rostrum <br /> C . Keep a transit and leveling ever necessary for layout of the Work , <br /> instrument man available for benchmarks ,en ontrol points , batter boards , <br /> D , provide all material required <br /> t grade stakes , andother <br /> riteor locations , dimensions and e el . No data other <br /> E . Be solely responsible <br /> he <br /> than written orders of the ENGINEER pEEhR�aawings ep marks made <br /> dimensions and levels require Y <br /> Safeguard all points , stakes , grademarl , monuments if distudrbed benchmarks <br /> all <br /> F . or established <br /> p not protecting or <br /> or established on the ed because of not maintaining , stakes , marks and <br /> ' Work improperly install pints , <br /> removing without authorization such established passistance as <br /> monuments .' the ENGINEER , provide such facilities and pints placed by <br /> t G , When requested b for the ENGINEER to check line and grade p <br /> may be necessary leted <br /> CTOR . Do no excavation or embankment <br /> has belenl comp <br /> the CONTRACTOR , <br /> for determining pay quantities <br /> cross- sectioning the ENGINEER . <br /> and checked by sneering and layout work described above shall be <br /> Hi . The cost of performsn en g g <br /> tract unit prices for the various items in work ngineeringit ss <br /> ' included in the con 1ent will be made for sure y g <br /> incidental . No separate pay <br /> SURVEY WORK AND QUALIFICATIONS OF SURVEYOR s to the <br /> 1 . 2 S himself a <br /> for to commencing work , the CONTRACTOR shall satisfy <br /> A • pr and existing site information as indicated sof any error sct <br /> ' accuracy of all survey the ENGINEER upon discovery of the <br /> data . The commencing of any <br /> Documents . Immediately notify <br /> inaccuracies or omissions in the survey d accurate ' without any <br /> ' work by the CONTRACTOR shall be held as the CONTRACTOR' s acceptance <br /> that all survey or existing site information is correct an <br /> reasonably inferable errors , inaccuracies or omissions . <br /> 01050 Field Engineering <br /> 01050 - 1 <br /> nn \Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-01050 - Field Engineering.doc <br /> F :\Enginee 9 <br />