My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01215 <br /> ' GENERAL QUALITY CONTROL <br /> ' 1 DESCRIPTION OF REQUIREMENTS k are indicated <br /> 1 . <br /> ' <br /> ns : Specific quality control requirements ments of this section are <br /> the wor <br /> A . Defmitio p <br /> throughout the Contract rfo mance oft e wuments . The re ork beyond the furnishing <br /> sI not f <br /> primarily related to thep <br /> term " � test ng and adeu <br /> Control" <br /> inc <br /> manufactured products . The tirements , <br /> sociaterq <br /> ' necessarily limited to , inspection an <br /> tion does not specify or modify the OWNER and ENGINEER duties <br /> This sec <br /> re <br /> and Contract surveil ancee <br /> relating to quality r <br /> ' FOR INSPECTIONS AND TESTS <br /> 1 . 2 RESPONSIBILITY ploy and pay for the <br /> A . Residual OWNER Responsibility : b rratohe W E perform lose required <br /> R will em <br /> services of independent testing la <br /> inspections and tests . whether <br /> B . CON <br /> ' TRACTORS General Responsibility : No failure, <br /> test agen <br /> engaged by the OWNER or CONTRACTOR , erfo m adequate enspections <br /> results , shall relive the <br /> of tests or to properly analyze or repo <br /> ' TOR of responsibility for the fulfillment of einsrequirements <br /> and testing <br /> CONTRACTOR <br /> Contract Documents . It is recognized that the requiredli <br /> ' program is intended to assist the CONTRACTOR , OW probable compliance with <br /> ENGINEER , <br /> and <br /> p ER <br /> governing authorities in the nominal determination of pr ents of work , The ram is not intended <br /> requirements for certain crucial CTOR in Slee ular quality control program , as needed <br /> ' to limit the l assurance of compliance * <br /> for gene <br /> ' 1 . 3 QUALITY ASSURANCE <br /> uirement that each category of <br /> A . General Workmanship Standards : it is a r be pre-qualified , to the extent of being <br /> tradesman or installer performing the <br /> ' ' r with the applicable and recognized quality itose standards� ry o <br /> familia Complying <br /> work , and being capable of workmanship <br /> ' 1 . 4 PRODUCT DELIVERY- STOR1 11AGE-HANDLING din fabricated components , by <br /> Handle , store and protect materials and products , inclu 9 losses (and <br /> which will prevent damage , deterioration and ce of the work suiting <br /> methods and means y performance term <br /> delays) , thereby ensuring highest quality results as the p long - <br /> ' <br /> storage <br /> resses . Control delivery schedules so as to minimize unnecessary <br /> storage at the project site prior to installation , <br /> + + END OF SECTION + + <br /> 01215 General Quality control <br /> 01215- 1 <br /> ' \Ca ital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-01215 - General Quality.doc <br /> F :\Engineering\Capital <br />
The URL can be used to link to this page
Your browser does not support the video tag.