My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' information is not guaranteed , however , and it shall be this CONTRACTOR Is <br /> responsibility to determine the location , <br /> character and depth of any existing <br /> r <br /> to <br /> utilities . He shall assist the utility companne <br /> shall be exercised o <br /> sed ery meanso <br /> autio ssible eliminate any determine said locations . Extreme c <br /> possibility of any damage to utilities resulting from his activities . <br /> 1 . 7 ADJUSTMENTS OF UTILITY CASTINGS COVERS AND BOXES <br /> ' A . All existing utility castings , including valve boxes , junction construction thataare to s ' pull boxes , inlets and <br /> similar structures in the areas <br /> remain in service shall be adjusted by the CONTRACTOR to bring them flush <br /> ' with the surface of the finished work . <br /> struction <br /> B . The CONTRACTOR shall coordinate the utilities <br /> to ensure survey reference <br /> r con cmarkers to <br /> rsequencing . CONTRACTOR shall make available <br /> the various utility companies , <br /> r <br /> r <br /> r <br /> + + END OF SECTION + + <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> r <br /> 01541 Protection of work <br /> r 01541 -5 <br /> F :\Engineering\Capital Projects\0386-Pelican Island upland Restoration\0386-Pelican Island -Contract Docs\0386-01541 Protection of <br /> PrODertv.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.