My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01630 <br /> SUBSTITUTIONS <br /> 1 . 1 GENERAL <br /> ' A . Requests for review of a substitution shall conform to the requirements of <br /> Article 6 . 05 , " Substitutes and Or- Equals , " of the General Conditions , and shall <br /> ' contain complete data substantiating compliance of the proposed substitution <br /> with the Contract Documents . <br /> ' 1 . 2 CONTRACTOR' S OPTIONS <br /> A . For materials or equipment ( hereinafter products ) specified only by reference <br /> standard , select product meeting that standard by any manufacturer, fabricator, <br /> supplier or distributor ( hereinafter manufacturer) . To the maximum extent <br /> possible , provide products of the same generic kind from a single source . <br /> B . For products specified by naming several products or manufacturers select any <br /> one of the products or manufacturers named which complies with Specifications . <br /> C . For products specified by naming one or more products or manufacturers and <br /> stating "or equivalent , " submit a request for a substitution for any product or <br /> ' manufacturer which is not specifically named . <br /> ' D . For products specified by naming only one product or manufacturer and followed <br /> by words indicating that no substitution is permitted , there is no option and no <br /> substitution will be allowed . <br /> ' E . Where more than one choice is available as a CONTRACTOR' s option , select <br /> product which is compatible with other products already selected or specified . <br /> ' 1 . 3 SUBSTITUTIONS <br /> A . During a period of 15 days after date of commencement of Contract Time , <br /> ENGINEER will consider written requests from CONTRACTOR for substitution of <br /> products or manufacturers , and construction methods ( if specified ) . <br /> ' 1 . After end of specified period , requests will be considered only in case of <br /> unavailability of product or other conditions beyond control of <br /> CONTRACTOR . <br /> B . Submit 5 copies of Request for Substitution . Submit a separate request for each <br /> substitution . In addition to requirements set forth in Article 6 . 7 of General Condi - <br /> ' tions , include in the request the following : <br /> 1 . For products or manufacturers : <br /> a . Product identification , including manufacturer' s name and address . <br /> ' 01630- 1 01630 Substitutions <br /> FAEngineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-01630 <br /> ' Substitutions .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.