My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . 04 Starting the Work additional insured identified in the Supplementary <br /> Conditions , certificates of insurance (and other <br /> er <br /> A. CONTRACTOR shall start to perform the additional ence of insurance wich f insured may heasonlahbly �equest)them <br /> owhich <br /> r any <br /> Work on the date when the Contract Times comrespectively are <br /> - <br /> mence to run . No Work shall be done at cohe mte mence to prior requiredo pOand u chase and maintain in accordance with <br /> ' to the date on which the Contract Times <br /> Article 5 . <br /> run . <br /> 2 .05 Before Starting Construction <br /> 2 .06 Preconstruction Conference <br /> A. Within 20 days after the Contract Times start <br /> A. CONTRACTOR 's Review p Contract Do Work, <br /> to run , but before any Work at the Site is started , a <br /> ments: Before undertaking each part of the Work, conference attended by CONTRACTOR, ENGINEER, <br /> ' CONTRACTOR shall carefully study and compare the <br /> s appropriate will be h <br /> others aeld to establish a <br /> and <br /> Contract Documents and check and verify pertinent and of understanding among the parties as to the <br /> figures therein and all applicable field measurements . <br /> CONTRACTOR shall promptly report in writing to Work and to discuss the schedules referred to in para- <br /> ENGINEER any conflict, error, ambiguity, or graph 2 .05 . 6 , procedures for handling Shop Drawings discrepancy which <br /> CONTRACTOR may discover and and other submittals , processing Applications for <br /> Pa ent, and maintaining required records . <br /> shall obtain a written interpretation or clarification from Ym <br /> ' ENGINEER before proceeding with any Work affected 2 .07 Initial Acceptance of Schedules <br /> thereby; however, CONTRACTOR shall not be liable <br /> to OWNER or ENGINEER for failure to report any A, Unless otherwise provided in the Contract <br /> ' conflict, error, ambiguity, or discrepancy in the <br /> Documents , at least ten days before submission of the <br /> Contract Documents unless CONTRACTOR knew or first Application for Payment a conference attended by <br /> reasonably should have known thereof. CONTRACTOR, ENGINEER, and others as appropri- <br /> B . Preliminary Schedules: Within ten dayafter NEERIbe as provl ded below the scheduled <br /> slsubmittedto Gin <br /> the Effective Date of the Agreement (unless otherwiseaccordance with paragraph 2 . 05 . 6 . CONTRACTOR <br /> specified in the General Requirements) , CONTRAC- shall have an additional ten days to make corrections <br /> TOR shall submit to ENGINEER for its timely review: and adjustments and to complete and resubmit the <br /> 1 . a preliminary progress schedule schedules . No progress payment shall be made to <br /> indicating the times (numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing letin the various stages submitted to ENGINEER. <br /> of the Work, including any Milestones specified 1 . The progress schedule will be <br /> in the Contract Documents ; acceptable to ENGINEER if it provides an <br /> 2 . a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawin and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times . Such acceptance will not <br /> b- impose on ENGINEER responsibility for the <br /> ' miffing , reviewing , and processing such P <br /> progress schedule , for sequencing , scheduling , <br /> submittal ; and or progress of the Work nor interfere with or <br /> 3 , a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR's <br /> all of the Work which includes quantities and <br /> full responsibility therefor. <br /> prices of items which when added together 2 CONTRACTOR's schedule of Shop <br /> equal the Contract Price and subdivides the Drawing and Sample submittals will be <br /> Work into component parts in sufficient detail to acceptable to ENGINEER if it provides a <br /> serve as the basis for progress payments workable arrangement for reviewing and <br /> during performance of the Work. Such prices processing the required submittals , <br /> will include an appropriate amount of overhead <br /> and profit applicable to each item of Work . 3 . CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> C . Evidence of Insurance: Before any Work at and substance if it provides a reasonable <br /> the Site is started , CONTRACTOR and OWNER shall <br /> each deliver to the other, with copies to each <br /> 00700- 10 <br /> 0386- 00700 - General Conditions <br /> FAEngineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General <br /> Conditions .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.