My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 . 06 Insurance <br /> 2 , the specific matters to be covered by <br /> such authority and responsibility will be A. OWNER's responsibilities , if any, in respect to <br /> itemized ; and purchasing and maintaining liability and property insur- <br /> ance are set forth in Article 5 . <br /> ' 3 , the extent of such authority and 8 , 07 Change Orders <br /> responsibilities will be provided . <br /> B . Unless otherwise provided in the A. OWNER is obligated to execute Change <br /> ' Supplementary Conditions , OWNER shall have sole Orders as indicated in paragraph 10 .03 . <br /> authority and responsibility for such coordination . 8 ,08 Inspections, Tests, and Approvals <br /> ' ARTICLE 8 - OWNER' S RESPONSIBILITIES A. OWNER's responsibility in respect to certain <br /> inspections , tests , and approvals is set forth in <br /> paragraph 13 . 03 . B . <br /> ' 8 .01 Communications to Contractor <br /> 8 .09 Limitations on OWNER 's Responsibilities <br /> A. Except as otherwise provided in these direct <br /> General Conditions , OWNER shall issue all communi- A. The OWNER shall n' authority <br /> over, nor be responsible for,cations to CONTRACTOR through ENGINEER . CONTRACTOR's techniq <br />ues , se- <br /> 8 .02 Replacement of ENGINEER quences , or procedures of construction , or the safety <br /> precautions and programs incident thereto , or for any <br /> A. In case of termination of the employment of failure of CONTRACTOR to comply with Laws and <br /> ENGINEER, OWNER shall <br /> ' int an engineer <br /> Regulations applicable to the <br /> rmance f <br /> whom CONTRACTOR makesreasonable WorOR willnobe responsible for <br /> ilure to perform <br /> objection , whose status <br /> theformer ENGINEER. accordance <br /> CONTRACTOR'oaOtheaContract Documents .he Work In <br /> Documents shall be that ofhe <br /> ' 8 . 03 Furnish Data 8 . 10 Undisclosed Hazardous Environmental <br /> Condition <br /> A. OWNER shall promptly furnish the data A. OWNER's responsibility in respect to an <br /> required of OWNER under the Contract Documents . <br /> undisclosed Hazardous Environmental Condition is <br /> 8 . 04 Pay Promptly When Due <br /> set forth in paragraph 4 . 06 . <br /> ' A. OWNER shall make payments to CONTRAC- 8 . 11 Evidence of Financial Arrangements <br /> TOR promptly when they are due as provided in A. If and to the extent OWNER has agreed <br /> to <br /> paragraphs 14 . 02 . 0 and 14 .07 . C . furnish CONTRACTOR reasonable evidence that <br /> ' 8 .05 Lands and Easements; Reports and Tests financial arrangements have been made to satisfy <br /> OWNER's obligations under the Contract Documents , <br /> A. OWNER's duties in respect of providing lands OWNER's responsibility in respect thereof will be as <br /> ' and easements and providing engineering surveys to set forth in the Supplementary Conditions , <br /> establish reference points are set forth in paragraphs <br /> 4 .01 and 4 .05 . Paragraph 4 .02 refers to OWNER's <br /> ' ARTICLE 9 - ENGINEER' S STATUS DURING <br /> identifying and making available to CONTRACTOR <br /> copies of reports of explorations and tests of CONSTRUCTION <br /> subsurface conditions and drawings of physical <br /> conditions in or relating to existing surface or <br /> ' subsurface structures at or contiguous to the Site that 9 . 01 OWNER 'S Representative <br /> have been utilized by ENGINEER in preparing the A. ENGINEER will be OWNER's representative <br /> Contract Documents . during the construction period . The duties and <br /> responsibilities and the limitations of authority of <br /> 00700-29 <br /> 0386- 00700 - General Conditions <br /> ' F:\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386- 00700 - General <br /> Conditions .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.