Chan Order Number 3 Summa <br /> Indian River Coun North Count Water Treatment Plant Expansion Phase II <br /> Potential <br /> Change <br /> Order Amount Explanation <br /> number Description <br /> Metering System $60,293.00 Adds Blue Planet self dhi sodium <br /> 22 Chemical <br /> hypochlorite pump skids,s, which <br /> makes for <br /> -- - <br /> easier pump and_component-change•out at- — - <br /> - - <br /> - - - - - - owner's request. Chemical metering system <br /> also adds pressure relief valves for greater <br /> safe <br /> 29 Gate Operator and Secur ty System $24,815.00 Security system to integrate with county wide <br /> access control. Actual contract amount was in <br /> excess of budget line item in contract <br /> documents, the security system integration <br /> system was priced by two independent <br /> contractors to t best rice. <br /> 31 Replace Edge Metal with Aluminum $21 ,373.00 Owner requested upgrade to replace corroded <br /> metal drip edge while doing construction project <br /> 32 Fiberglass chemical room doors $12,425.00 This IS an owner requested upgrade of the <br /> existing doors to the chemical rooms to be <br /> replaced with corrosion resistant fiberglass <br /> doorses odur W,. <br /> 01 D�l <br /> 37 Upgrade Scrubber Walkways $6,956.00 galvanizad steel to aluminum for more cheays mical <br /> resistance. <br /> 38 Future well conduits to north $37 , 334.00 Adds conduit to north for additional well power <br /> and control , owners request because of new <br /> well field confi uration. <br /> 39 Irrigation Allowance and Repair $10,409.00 Additional irrigation repairs for system beyond <br /> allowance in bid documents. <br /> 40 Credit for Hypochlorite injection point ($5,473.00) Shortens double <br /> contained sodium hypochlorite <br /> between ground storage <br /> tanks to after transfer um s. <br /> 41 Relocation of Panel for Blowers on Clearwell $21 ,040.00 Relotiof instrumentation <br /> becauseon clearance conflict with blowoerpanel <br /> housin . <br /> 42 Assist with dewatering of Existing Pond $ 11 , 355.00 Excavation of sediment from infiltration pond <br /> after dewatering effort transported undesirable <br /> reci itant into and hinderin ermissivel . <br /> Total Amount Change Order No. 3 $2009527 .00 <br /> Revised Contrail Price <br /> Original Contract Price $21 ,080,300 <br /> ($804,632.00) $20,275,668. 00 <br /> Change Order Number 1 20 , 564,492.00 <br /> Change Order Number 2 $288,824.00 $ <br /> Change Order Number 3 <br /> $200,527.00 $209765,019.00 <br />