Laserfiche WebLink
Change <br />order <br />22 L;nemicai meicnny „r <br />M <br />32 Fiberglass chemical room <br />37 Upgrade Scrubber Walkw <br />38 Future well conduits to nc <br />39 Irrigatiori Allowance and I <br />40 Credit for Hypochlorite in <br />., Rclnc7tinn of Panel for E <br />System <br />chlorite pump skids, which makes for <br />rpump and _component-change•out at- — - <br />:eS request. Chemical metering system <br />adds pressure relief valves for greater <br />=Actual <br />to integrate with county wide <br />Actual contract amount was inet line item in contract <br />security system integration <br />iced by two independentt best rice. <br />ier requested upgrade to replace corroded <br />al drip edge while doing construction project <br />is an owner requested upgrade of the <br />iting doors to the chemical rooms to be <br />aced with corrosion resistant fiberglass <br />odor control scrubber walkways from <br />I steel to aluminum for more chemical <br />conduit to north for additional well power <br />control, owners request because of new <br />point ($5,473.00) Shortens tllned sodium ncenpoinfrom between ground storage <br />tanks to after transfer um s. <br />on Clearwell $21,040.00 Relobecause of clearance conflict n of instrumentation with blowoe panel <br />housin . <br />ig Pond $11,355.00 Excavation of sediment from infiltration pond <br />after dewatering effort transported undesirable <br />Total Amount Change Order No. 3 <br />Original Contract Price <br />Change Order Number 1 <br />Change Order Number 2 <br />Change Order Number 3 <br />$2009527.00 <br />Revised Contrail Price <br />$21,080,300 <br />($804,632.00) $20,275,668.00 <br />$288,824.00 $20,564,492.00 <br />$200,527.00 $209765,019.00 <br />