My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-028
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2016 1:46:15 PM
Creation date
9/30/2015 11:56:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/22/2008
Control Number
2008-028
Agenda Item Number
11.J.1
Entity Name
Poole and Kent Company of Florida
Subject
North County Water Treatment Plant Expansion Change Order No.3
Area
North County Water Treatment Plant
Project Number
200612
Supplemental fields
SmeadsoftID
6849
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chan Order Number 3 Summa <br /> Indian River Coun North Count Water Treatment Plant Expansion Phase II <br /> Potential <br /> Change <br /> Order Amount Explanation <br /> number Description <br /> Metering System $60,293.00 Adds Blue Planet self dhi sodium <br /> 22 Chemical <br /> hypochlorite pump skids,s, which <br /> makes for <br /> -- - <br /> easier pump and_component-change•out at- — - <br /> - - <br /> - - - - - - owner's request. Chemical metering system <br /> also adds pressure relief valves for greater <br /> safe <br /> 29 Gate Operator and Secur ty System $24,815.00 Security system to integrate with county wide <br /> access control. Actual contract amount was in <br /> excess of budget line item in contract <br /> documents, the security system integration <br /> system was priced by two independent <br /> contractors to t best rice. <br /> 31 Replace Edge Metal with Aluminum $21 ,373.00 Owner requested upgrade to replace corroded <br /> metal drip edge while doing construction project <br /> 32 Fiberglass chemical room doors $12,425.00 This IS an owner requested upgrade of the <br /> existing doors to the chemical rooms to be <br /> replaced with corrosion resistant fiberglass <br /> doorses odur W,. <br /> 01 D�l <br /> 37 Upgrade Scrubber Walkways $6,956.00 galvanizad steel to aluminum for more cheays mical <br /> resistance. <br /> 38 Future well conduits to north $37 , 334.00 Adds conduit to north for additional well power <br /> and control , owners request because of new <br /> well field confi uration. <br /> 39 Irrigation Allowance and Repair $10,409.00 Additional irrigation repairs for system beyond <br /> allowance in bid documents. <br /> 40 Credit for Hypochlorite injection point ($5,473.00) Shortens double <br /> contained sodium hypochlorite <br /> between ground storage <br /> tanks to after transfer um s. <br /> 41 Relocation of Panel for Blowers on Clearwell $21 ,040.00 Relotiof instrumentation <br /> becauseon clearance conflict with blowoerpanel <br /> housin . <br /> 42 Assist with dewatering of Existing Pond $ 11 , 355.00 Excavation of sediment from infiltration pond <br /> after dewatering effort transported undesirable <br /> reci itant into and hinderin ermissivel . <br /> Total Amount Change Order No. 3 $2009527 .00 <br /> Revised Contrail Price <br /> Original Contract Price $21 ,080,300 <br /> ($804,632.00) $20,275,668. 00 <br /> Change Order Number 1 20 , 564,492.00 <br /> Change Order Number 2 $288,824.00 $ <br /> Change Order Number 3 <br /> $200,527.00 $209765,019.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.