My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-028
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:47:27 AM
Creation date
9/30/2015 11:56:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/22/2008
Control Number
2008-028
Agenda Item Number
11.J.1
Entity Name
Poole and Kent Company of Florida
Subject
North County Water Treatment Plant Expansion Change Order No.3
Area
North County Water Treatment Plant
Project Number
200612
Supplemental fields
SmeadsoftID
6849
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change <br />order <br />22 L;nemicai meicnny „r <br />M <br />32 Fiberglass chemical room <br />37 Upgrade Scrubber Walkw <br />38 Future well conduits to nc <br />39 Irrigatiori Allowance and I <br />40 Credit for Hypochlorite in <br />., Rclnc7tinn of Panel for E <br />System <br />chlorite pump skids, which makes for <br />rpump and _component-change•out at- — - <br />:eS request. Chemical metering system <br />adds pressure relief valves for greater <br />=Actual <br />to integrate with county wide <br />Actual contract amount was inet line item in contract <br />security system integration <br />iced by two independentt best rice. <br />ier requested upgrade to replace corroded <br />al drip edge while doing construction project <br />is an owner requested upgrade of the <br />iting doors to the chemical rooms to be <br />aced with corrosion resistant fiberglass <br />odor control scrubber walkways from <br />I steel to aluminum for more chemical <br />conduit to north for additional well power <br />control, owners request because of new <br />point ($5,473.00) Shortens tllned sodium ncenpoinfrom between ground storage <br />tanks to after transfer um s. <br />on Clearwell $21,040.00 Relobecause of clearance conflict n of instrumentation with blowoe panel <br />housin . <br />ig Pond $11,355.00 Excavation of sediment from infiltration pond <br />after dewatering effort transported undesirable <br />Total Amount Change Order No. 3 <br />Original Contract Price <br />Change Order Number 1 <br />Change Order Number 2 <br />Change Order Number 3 <br />$2009527.00 <br />Revised Contrail Price <br />$21,080,300 <br />($804,632.00) $20,275,668.00 <br />$288,824.00 $20,564,492.00 <br />$200,527.00 $209765,019.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.