The DEVELOPER shall prepare at its own expense, plans, specifications, Agreement, advertisement, <br /> general conditions, hereinafter referred to as the "contract documents", for the lines and facilities necessary <br /> to deliver the water and wastewater utilities from the COUNTY' S facilities . All plans and specifications <br /> shall be subject to the COUNTY' s approval prior to the DEVELOPER' s application. The DEVELOPER <br /> shall be responsible for all costs associated with the design, permitting and construction of the offsite <br /> facilities (which includes but is not limited to transmission lines, valves, fittings, hydrants, meters, and <br /> associated appurtenances) whether designed, permitted or constructed by the DEVELOPER or the <br /> COUNTY. <br /> The design, permitting, construction, operation and maintenance of all on-site water and wastewater utilities <br /> which is on or solely dedicated to the DEVELOPER ' s property (including but not limited to water meter, <br /> transmission lines, pumps, valves, storage facilities, etc.) shall be the DEVELOPER' s responsibility and <br /> expense. Construction of on-site water and wastewater utilities shall be subject to COUNTY review and <br /> approval. <br /> The DEVELOPER shall be deemed in possession of the potable water on the DEVELOPER ' s side of the <br /> water meter, however the DEVELOPER shall not be deemed to own the water, and the transfer or sale of <br /> water by the DEVELOPER is prohibited. <br /> The DEVELOPER may not transfer or sell water or wastewater capacity to any party for use off-site of the <br /> Property <br /> 10 . Easements : <br /> The DEVELOPER shall convey to the COUNTY a utility easement for the water and wastewater utilities for <br /> the COUNTY to install, maintain, operate and monitor the water and wastewater utilities, within the private <br /> right-of-way including, but not limited to, water lines, services, laterals, manholes, meters, lift station, sewer, <br /> remote monitoring and related utility structures. <br /> After the COUNTY' S final inspection of the off-site water and wastewater facilities for conformance with <br /> the approved plans and specifications, the DEVELOPER shall convey all the off-site facilities together with <br /> an interest in land, as may be required by the COUNTY, to the COUNTY. The conveyance shall include <br /> any of the following documents as may be required by the COUNTY, in a form acceptable to the COUNTY: <br /> a) Bill of Sale <br /> b) Grants of Easements <br /> c) Maintenance Bond <br /> d) Record Drawings (hard copy and electronic format — AutoCAD rel. 14 .0 or higher) <br /> I L Entire Agreement <br /> This Agreement embodies the entire agreement between the parties relative to the subject matter hereof, and <br /> there is no oral or written agreements between the parties, nor any representations made by either party <br /> relative to the subject matter hereof, which are not expressly set forth herein . <br /> 12 . Governing Law & Jurisdiction • <br /> This Agreement shall be governed by the laws of the State of Florida and the laws of the United States <br /> pertaining to transactions in such state, and all actions arising out of this Agreement shall be brought in <br /> Indian River County, Florida, or, in the event of federal jurisdiction, the United States District Court forthe <br /> Southern District of Florida. All of the parties to this Agreement have participated freely in the negotiation <br /> and preparation hereof Accordingly, this Agreement shall not be more strictly construed against any one of <br /> the parties hereto. <br /> Page 3 <br />