My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-079
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 10:58:50 AM
Creation date
9/30/2015 6:26:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
04/01/2003
Control Number
2003-079
Agenda Item Number
11.H.6.
Entity Name
Post, Buckley, Schuh & Jernigan, Inc. (PBS&J)
Subject
Odor Control Improvements
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3202
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> CENTRAL WASTEWATER TREATMENT FACILITY <br /> AND REGIONAL SLUDGE PROCESSING FACILITY <br /> SCOPE OF SERVICES <br /> I . PROJECT DESCRIPTION <br /> The objective of this project is to implement certain odor control improvements at the Indian <br /> River County ( IRC) Central Wastewater Treatment Facility (WWTF) and Regional Sludge <br /> Processing Facility ( RSF) . The basis of the odor control improvements will be the Central <br /> WWTF Odor Control Study prepared by PBS&J in February 2003 . PBS &J conceptually <br /> estimates the construction cost of these improvements to be in the range of $ 1 , 200 , 000 . <br /> Il . SCOPE OF SERVICES <br /> The specific services and tasks to be provided by PBS &J are described as follows : <br /> Task 1 as Consultation with IRC Staff for County Implementation of Certain Odor <br /> Improvements <br /> Certain odor improvements are to be implemented via quotes from existing County <br /> contractors to IRC staff. PBS &J will support this effort by providing telephone consultation , <br /> periodic site visits , sketches , abbreviated technical specifications , and other technical <br /> support as detailed in the following tasks . <br /> It is understood from IRC staff that the following improvements described in PBS &J ' s Odor <br /> Control Study have already been completed (or will be completed by IRC staff) and do not <br /> require further assistance from PBS&J : <br /> • Improvements to Sludge and Septage Storage Tanks Ventilation <br /> • Addition of gaskets on the headworks structure <br /> • Addition of internal recycle for the anoxic tank <br /> • Coverage of belt press drain sumps <br /> CAF/bwN:\Projects\IRCOUNCY\Continuing Wastewater Services\Central & South W WTP Odor Contro1\0I Proposals\l . l Proposals\ATTACHMENT A TO Central WWTF SCOPE <br /> 3-24- <br /> 032.doc <br /> Last Revised 3/24/2003 4:38 PM <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.