My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-079
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 10:58:50 AM
Creation date
9/30/2015 6:26:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
04/01/2003
Control Number
2003-079
Agenda Item Number
11.H.6.
Entity Name
Post, Buckley, Schuh & Jernigan, Inc. (PBS&J)
Subject
Odor Control Improvements
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3202
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> CENTRAL WASTEWATER TREATMENT FACILITY <br /> AND REGIONAL SLUDGE PROCESSING FACILITY <br /> SCOPE OF SERVICES (Continued) <br /> G - 1 Cover Sheet <br /> G -2 Central WWTF Site Plan <br /> C- 1 Central WWTF Grading and Drainage <br /> S- 1 Structural Notes and Abbreviations <br /> S-2 Structural Plans , Sections and Details <br /> S-3 Structural Plans , Sections and Details <br /> S-4 Structural Plans , Sections and Details <br /> M- 1 RSF Blower Plan , Sections and Details <br /> M-2 Central WWTF Anoxic Basin Cover Plan , Sections and Details <br /> M-3 Central WWTF Anoxic Basin Duct & Biofilter Plan , Section and Detail <br /> M-4 Mechanical Details <br /> HVAC- 1 Central WWTF Screening Dumpster Area Ventilation Plan , Sections and Details <br /> E - 1 Central WWTF Electrical Site Plan <br /> E -2 Central WWTF Single Line Diagra <br /> E-3 RSF Blower Electrical Plan and Details <br /> E -4 Central WWTF Biofilter Electrical Plan and Details <br /> E -5 Electrical Conduit and Wire Schedules <br /> E -6 Central WWTF MCP Layouts <br /> E-7 Electrical Miscellaneous Details <br /> 1 - 1 Central WWTF MCP PLC Input Schematic Diagram <br /> Task 2 . 1 - Construction Plans - New RSF Blowers and Controls <br /> PBS&J will prepare construction plan sheets for the addition of variable frequency drive <br /> (VFD ) control of the existing RSF blower and the addition of a second smaller blower for the <br /> sludge septage storage tank duct. Included in this effort is the installation of an automated <br /> damper on the exhaust duct from the Dewatering Building . <br /> Task 2 . 2 - Construction Plans - Central WWTF Anoxic Basin Covers and Odor Control <br /> PBS&J will prepare construction plan sheets for the addition of aluminum or fiberglass <br /> covers for the Central WWTF anoxic basins . PBS&J will prepare construction plan sheets <br /> for the addition of a modular biofilter and associated duct , blower, electrical and controls , for <br /> the covered anoxic basins . <br /> Task 2 . 3 - Construction Plans - Central WWTF Internal Recirculation System <br /> CAF/bwN:\Projects\[RCOUNTY\Continuing Wastewater Smices\Central & South W WTP Odor Contro1\01 Proposals\ l . I Proposals\ATTACHMENT A TO Central WWTF SCOPE 3-24- <br /> 032.doc <br /> Inst Revised 3/24/2003 4: 38 PM <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.