Laserfiche WebLink
Brine to North Relief Canal Project Budget Summary <br /> 16" Brine Line-21 , 120 L . F . $ 17500 , 000 . 00 <br /> Wetlands Development $ 300 , 000 .00 <br /> Pumping Station at North Relief Canal $ 500 , 000 . 00 <br /> Mechanical Aerator Mixing Basin $ 5009000 . 00 <br /> Pumping Station at 10 MG Basin Tailworks $ 500 ,000 .00 <br /> CONSTRUCTION SUBTOTAL $ 31300 , 000 .00 <br /> 15% Contingency $ 4953000 .00 <br /> CONSTRUCTION TOTAL $ 3 , 7951000 .00 <br /> Engineering , Permitting and Inspection (14 . 6% Construction Total) $ 554 , 070 . 00 <br /> PROJECT GRAND TOTAL $ 41349 ,070 .00 <br />