Laserfiche WebLink
� - Ik - o3 <br /> ti /l G03 <br /> PROFESSIONAL CIVIL ENGINEERING SERVICES C) S ` o L 1 <br /> AGREEMENT FOR CIVIL ENGINEERING <br /> AND BRIDGE DESIGN SERVICES <br /> THIS AGREEMENT, entered into this 18th day of March 2003 by and <br /> between INDIAN RIVER .COUNTY, a political subdivision of the State of Florida, hereinafter refereed to <br /> as the COUNTY, and BRIDGE DESIGN ASSOCIATES , INC. , Vero Beach, Florida, hereinafter referred <br /> to as the ENGINEER, <br /> WITNESSETH <br /> The COUNTY and the ENGINEER, in consideration of the mutual covenants, herein agree with <br /> respect to the performance of professional civil engineering, bridge design and related services by the <br /> ENGINEER and the payment for those services by the COUNTY as set forth below. <br /> The ENGINEER shall provide professional engineering and related services for the COUNTY in <br /> all phases of the project described in SECTION III-Scope of Services; serve as the COUNTY ' S <br /> professional representative for the project; and shall give professional engineering and land surveying <br /> advise to the COUNTY during the performance of the services to be rendered. <br /> SECTION I - PROJECT LIMITS AND DESCRIPTION <br /> Consultant services are required for the preparation of design surveys, roadway improvement <br /> plans, bridge replacement plans and permit applications for the replacement of three bridges and associated <br /> roadway improvements. The three bridge locations are 5th Street SW over 43 `d Avenue Ditch (No. <br /> 884048), Old Dixie Highway over South Relief Canal (No . 880031 ), and 43`d Avenue over South Relief <br /> Canal (No. 880045 ) . The associated roadway and bridge improvements at each location are as follows : <br /> 5th Street SW over 43 `d Avenue Ditch — the COUNTY desires to replace the existing two-lane <br /> structure on 5d' Street SW with a three-lane structure. In addition, left-turn lanes will be designed <br /> on the east approach, south approach and north approach to the 5d' Street SW and 43 `d Avenue <br /> Intersection. Realignment will be designed for 5d' Street SW east of 43 `d Avenue to align with 5d' <br /> Street SW west of 43 `d Avenue. The approximate total length of all approaches is '/z mile . Any <br /> required change in roadway elevation, to accommodate the bridge vertical grade, is anticipated to <br /> be accommodated within the above listed roadway improvements. <br /> Old Dixie Highway over South Relief Canal — the COUNTY desires to replace the existing two- <br /> lane structure on Old Dixie Highway to with a three-lane structure. In addition, a three-lane <br /> roadway section will be designed between I 't Street and 2nd Street. The approximate total length <br />