My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK DIRECTIVE CHANGE <br /> INSTRUCTIONS <br /> A . GENERAL INFORMATION <br /> This document was developed for use in situations involving changes in the Work which , <br /> if not processed expeditiously , might delay the Project . These changes are often initiated <br /> in the field and may affect the Contract Price or the Contract Time . This is not a' Change <br /> Order , but only a directive to proceed with Work that may be included in a subsequent <br /> ' Change Order. <br /> For supplemental instructions and minor changes not involving a change in the Contract <br /> Price or the Contract Time , a Field Order may be used . <br /> Be COMPLETING THE WORK DIRECTIVE CHANGE FORM <br /> Engineer initiates the form , including a description of the items involved and attachments . <br /> Based on conversations between Engineer and Contractor , Engineer completes the fol - <br /> ' lowing : <br /> METHOD OF DETERMINING CHANGE , IF ANY , IN CONTRACT PRICE : Mark <br /> the method to be used in determining the final cost of Work involved and the net <br /> effect on the Contract Price . If the change involves an increase in the Contract Price <br /> and the estimated amount is approached before the additional or changed Work is <br /> ' completed , another Work Directive Change must be issued to change the time or <br /> Contractor may stop the changed Work when the estimated time is reached . U the <br /> Work Directive Change is not Iikely to change the Contract Time , the space for <br /> ' estimated increase ( decrease) should be marked " Not Applicable " . <br /> METHOD OF DETERMINING CHANGE , IF ANY , IN CONTRACT TIME : Mark <br /> the method to be used in determining the change in Contract Time and the estimated <br /> 1 increase or decrease in Contract Time . If the change involves an increase in the <br /> Contract Time and the estimated time is approached before the additional or changed <br /> Work is completed , another Work Directive Change must be issued to change the <br /> time or Contractor may stop the changed Work when the. estimated time is reached . <br /> If the Work Directive Change is not likely to change the Contract Time , the space <br /> for estimated increase (decrease) should be marked " Not Applicable " . <br /> Once Engineer has completed and signed the form , all copies should be sent to Owner for <br /> authorization because Engineer alone does not have authority to authorize changes in <br /> Price or Time . Once authorized by Owner , a copy should be sent by Engineer to Con- <br /> tractor . <br /> Once the Work covered by this directive is completed or final cost and time determined , <br /> Contractor should submit documentation for inclusion in a Change Order . <br /> THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT <br /> THE CONTRACT PRICE OR THE CONTRACT TIME . A CHANGE ORDER , IF ANY , <br /> SHOULD BE CONSIDERED PROMPTLY . <br /> 1 <br /> 00800- 17 _ - <br />