My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6706 - 050 <br /> 4 . Shop Drawings and Samples : <br /> a . Receive and record date of receipt of Shop Drawings and samples , <br /> receive samples which are furnished at the site by CONTRACTOR , and <br /> notify ENGINEER of their availability for examination . <br /> b . Advise ENGINEER and CONTRACTOR or his superintendent immediately <br /> of the commencement of any Work requiring a Shop Drawing or sample <br /> submission if the submission has not been approved by the ENGINEER . <br /> 5 . Review of Work , Rejection of Defective Work, Inspections and Tests : <br /> a . Conduct on - site observations of the Work in progress to assist ENGINEER <br /> in determining if the Work is proceeding in accordance with the Contract <br /> Documents and that completed Work , will conform to the Contract <br /> Documents . <br /> b . Report to ENGINEER whenever he believes that any Work is <br /> unsatisfactory , faulty or defective or does not conform to the Contract <br /> Documents , or does not meet the requirements of any inspections , tests <br /> or approval required to be made or has been damaged prior to final <br /> payment ; and advise ENGINEER when he believes Work should be <br /> corrected or rejected or should be uncovered for observation , or requires <br /> special testing , inspection or approval , i <br /> c . Verify that tests , equipment and systems startups and operating and <br /> maintenance instructions are conducted as required by the Contract <br /> Documents and in presence of the required personnel , and that <br /> CONTRACTOR maintains adequate records thereof; observe , record and <br /> report to ENGINEER appropriate details relative to the test procedures and <br /> startups . <br /> d . Accompany visiting inspectors representing public or other agencies <br /> having jurisdiction over the Project , record the outcome of these <br /> inspections and report to ENGINEER . <br /> 6 . Interpretation of Contract Documents : Transmit to CONTRACTOR <br /> engineer ' s clarifications and interpretations of the Contract Documents . <br /> 7 . Modifications : Consider and evaluate CONTRACTOR ' S suggestions for <br /> modifications in Drawings or Specifications and report them with <br /> recommendations to ENGINEER . <br /> 00800 - 27 s <br /> 2/21 /95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.