My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6706 - 050 <br /> 12 . Completion . <br /> a . Before ENGINEER issues a Certificate of Substantial Completion , submit <br /> to CONTRACTOR a list of observed items requiring completion or <br /> correction . <br /> b . Conduct final inspection in the company of ENGINEER , OWNER and <br /> CONTRACTOR and prepare a final list of items to be completed or <br /> corrected . <br /> c . Verify that all items on final list have been completed or corrected and <br /> make recommendations to ENGINEER concerning acceptance . <br /> co LIMITATIONS OF AUTHORITY <br /> Except upon written instructions of ENGINEER , Resident Project <br /> Representative . <br /> 1 . Shall not authorize any deviation from the '- Contract Documents or approve <br /> any substitute materials or equipment . <br /> 2 . Shall not exceed limitations on ENGINEER ' S authority as set forth in the <br /> Contract Documents , <br /> 3 . Shall not undertake any of the responsibilities of CONTRACTOR , <br /> Subcontractors or CONTRACTOR ' S superintendent , or expedite the Work . <br /> 4 . Shall not advise on or issue directions relative to any aspect of the means , <br /> methods , techniques , sequences or procedures of construction unless such is <br /> specifically called for in the Contract Documents . <br /> 5 . Shall not advise on or issue directions as to safety precautions and programs <br /> in connection with the Work . <br /> 6 . Shall not authorize OWNER to occupy thet 'Project in whole or in part . <br /> 7 . Shall not participate in specialized field or laboratory tests . <br /> END OF SECTION <br /> 00800 - 29 <br /> 2/21 /86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.