My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Equipment required . <br /> 3 . Products required : <br /> a . Recommended source of purchase and unit cost . <br /> b . Quantities required . <br /> 4 . Taxes , insurance bonds . <br /> ' 5 . Credit for work deleted from Contract, similarly documented . <br /> 6 . Overhead and profit. <br /> 7 . Justification for any change in Contract Time , <br /> C . Support each claim for additional costs , and for work done on a time-and- <br /> material / force account basis , with documentation as required for a lump <br /> ' sum proposal , plus the following additional information : <br /> 1 . Name of the Owner's authorization agent who ordered the work , <br /> and date of the order. <br /> 2 . Dates and time work performed , and by whom . <br /> 3 . Time record , summary of hours worked , and hourly rates paid . <br /> 4 . Receipts and invoices for: <br /> a . Equipment used , listing dates and times of use . <br /> b . Products used , listing quantities . <br /> C. Subcontracts . <br /> ' D . Document requests for substitutions for Products as specified in Section <br /> 01600 , <br /> 1 .07 PREPARATION OF CHANGE ORDERS <br /> ' A. Engineer will prepare each Change Order. <br /> B . Form : Change Order format provided in the Contract Documents . <br /> C . Change Order will describe changes in the Work , both additions and <br /> deletions , with attachments of revised Contract Documents to define <br /> details of change . <br /> D . Change Order will provide an accounting of the adjustment in the <br /> Contract Sum and in the Contract Time . <br /> ' 1 . 08 LUMP SUM / FIXED PRICE CHANGE ORDER <br /> ' A . Content of Change Orders will be based on either: <br /> 1 . Engineer's Proposal Request and Contractor's responsible <br /> ' Proposal as mutually agreed upon between Owner and <br /> Contractor. <br /> 2 , Contractor's Proposal for a change , as recommended by <br /> Engineer. <br /> B . Owner and Engineer will sign and date the Change Order as <br /> authorization for the contractor to proceed with the changes . <br /> C . Contractor shall sign and date the Change Order to indicate agreement <br /> with the terms therein . <br /> ' 01153 - 3 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01153 Change Order Procedures .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.