Laserfiche WebLink
' SECTION 01340 <br /> SHOP DRAWINGS , PRODUCT DATA AND SAMPLES <br /> PART 1 -- GENERAL <br /> ' 1 . 01 REQUIREMENTS INCLUDED <br /> A. Submit Shop Drawings , Product Data , Samples and Certificates <br /> required by the Contract Documents . <br /> ' B . Review and approval by Contractor of submitted material . <br /> 1 . 02 RELATED REQUIREMENTS <br /> A. In other parts of the Contract Documents : <br /> 1 . Definitions and Additional Responsibilities of Parties : <br /> a . General Conditions of the Contract <br /> ( 1 ) Sections 6 . 23 — 6 . 28 : Shop Drawings <br /> B . Specified in other sections : <br /> 1 . Section 01311 : Construction Schedules . <br /> 2 , Section 01720 : Record Documents <br /> C . Designate in the construction schedule , or in separate coordinated <br /> schedule , the dates for the submission and the dates that <br /> reviewed Shop Drawings , Product Data and Samples will be <br /> needed . <br /> 1 . 03 SHOP DRAWINGS <br /> A . Drawings shall be presented in a clear and thorough manner. <br /> 1 . Details shall be identified by reference to sheet and detail <br /> of schedule shown on Contract Drawings , <br /> B . Minimum sheet size : Manufacturer's standard ; adequate to <br /> clearly illustrate . <br /> ' 01340 - 1 <br /> F:\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01340 Shop Drawings, Product Data and Samples.doc <br />