My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> 2 . 03 CAMERA <br /> The color video camera used in the recording system shall have a <br /> horizontal resolution of 300 lines at center, a luminance signal-to-noise <br /> ratio of 45dB , and a minimum illumination requirement of 25 foot candies . <br /> 2 . 04 TAPES <br /> Audio-video tapes shall be new. Reprocessed tapes will not be <br /> acceptable . The tapes shall be one-half inch , high energy , extended still <br /> frame capable videocassette , shall be interchangeable with the color <br /> videocassette player, and shall be compatible for playback with the <br /> player-receiver. <br /> PART 3 -- EXECUTION <br /> 3 . 01 VIDEOTAPING PROCEDURES <br /> A. Each tape shall begin with the current date , project name , and <br /> municipality, and be followed by the general location ; i . e . , name of <br /> street, house address , viewing side , and direction of progress . <br /> The audio track shall consist of an original live recording . The <br /> recording shall contain the narrative commentary . <br /> B . All video recordings must, by electronic means , display <br /> continuously and simultaneously generate , with the actual taping , <br /> transparent digital information to include the date and time of <br /> recording , and station numbers , if shown on the Drawings . The <br /> date information shall contain the month , day, and year. The time <br /> information shall contain the hour, minute , and second . Additional <br /> information shall be displayed periodically. Such information shall <br /> include , but not be limited to, project name , contract number, <br /> name of street, house address , direction of travel , and the viewing <br /> side . The transparent information shall appear on the screen . <br /> C . All taping shall be done during times of good visibility. No taping <br /> shall be done during precipitation , mist , or fog . The recording <br /> shall be done only when sufficient sunlight is present to properly <br /> illuminate the subjects of recording and to produce bright, sharp <br /> video recordings of those subjects . <br /> D . The rate of speed in the general direction of travel of the vehicle <br /> ' used during taping shall not exceed 44 feet per minute . Panning , <br /> zoom-in , and zoom-out rates shall be sufficiently controlled to <br /> maintain a clear view of the object . <br /> 01381 - 2 <br /> F :\Utilities\UTILITY - EMPLOYEE FOLDERS\Art Pfeffer\BID DOCUMENTS North County RO\BID DOCUMENTS\01381 Audio- <br /> Visual Documentation .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.