My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-138
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 2:05:06 PM
Creation date
9/30/2015 7:37:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/15/2004
Control Number
2004-138
Agenda Item Number
7.G.
Entity Name
Timothy Rose Contracting
Subject
Discharge Outlet and Rip Rap Spillway Mat
Contract and Specifications
Area
North County
Project Number
2208
Bid Number
6069
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3827
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . When Engineer concurs that the work is substantially complete , he will : <br /> 1 . Prepare a Certificate of Substantial Completion , accompanied by <br /> a list of items to be completed or corrected <br /> 2 . Submit the Certificate to Owner and Contractor for their written <br /> acceptance of the responsibilities assigned to them in the <br /> certificate . <br /> 1 . 03 FINAL INSPECTION <br /> A. When Contractor considers the work is complete , he shall submit written <br /> certification that : <br /> 1 . Contract Documents have been reviewed <br /> 2 . Work has been inspected for compliance with Contract <br /> Documents <br /> 3 . Work has been completed in accordance with Contract <br /> Documents <br /> 4 . Equipment and systems have been tested in the presence of the <br /> Owner's representative and are operational <br /> 5 . Equipment and systems instructions to Owner's personnel have <br /> been completed in accordance with Section 01730 <br /> 6 . Work is completed and ready for final inspection <br /> B . Engineer will make an inspection to verify the status of completion with <br /> reasonable promptness after receipt of such certification . <br /> C . Should Engineer consider that the work is incomplete or defective : <br /> 1 . Engineer will promptly notify the Contractor, in writing , listing the <br /> incomplete or defective work . <br /> 2 . Contractor shall take immediate steps to remedy the stated <br /> deficiencies , and send a second written certification to Engineer <br /> that the work is complete . <br /> 3 . Engineer will re-inspect the work <br /> D . When Engineer finds that the work is acceptable under the Contract <br /> Documents , he shall request the Contractor to make closeout submittals . <br /> 1 . 04 RE -INSPECTION FEES <br /> Should the Engineer perform re- inspection due to failure of the work to comply <br /> with the claims of status of completion made by the Contractor, Contractor will <br /> compensate Engineer/Owner for such additional services . <br /> 01700 - 2 <br /> F :\Utilities\UTILITY - ENGINEERING\WTP - North RO\N RO Brine Line Discharge - UCP#2208\BID DOCUMENTS North County <br /> RO\BID DOCUMENTS\01700 ContractClose-out.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.